background image

Planning Information

3

PRODUCT DIMENSIONS AND CLEARANCES

These Monogram free-standing refrigerators require the

following clearances for proper air circulation, plumbing

and electrical connections.

Air Circulation Clearances:

• 1/8" on each side

• 1/2" at the back side

Installation in a corner:

• Allow 4" clearance on each side to an adjacent wall for a

90° open ing and access to drawers.

• Allow 15" clearance to wall on each side for removal

of drawers.

69-5/8"

35-7/8"

Depth Including Handles

29-1/2" - Tubular Handles

30-1/4" - Professional Handles

27-1/2"

Depth

35-7/8"

Case Width

THE INSTALLATION SPACE

The opening width must be at least 36".

Water And Electrical Locations 

The opening must be prepared with the electrical and

water supply located as shown.

Additional Specifications

• A 115 volt 60Hz., 15 or 20 amp power supply is required.

An individual properly grounded branch circuit or circuit

breaker is recommended. Install a properly grounded 

3-prong electrical receptacle recessed into the back wall. 

NOTE:

GFI (ground fault interrupter) is not recommended.

• The cold water line can enter the opening through the

floor or through an adjacent cabinet, as close to the back 

wall as possible. The water line should be GE

SmartConnect

™ 

Refrigerator Tubing or 1/4" O.D. copper

tubing between the cold water line and water con nec tion

location at the rear of the re frig er a tor. Installation of an

easily accessible shut off valve in the water line is 

rec om mend ed.

70" min.

36" min.

Electrical

Area

Wall View

Water Supply

Summary of Contents for WX08X10002

Page 1: ...Installation Instructions Stainless Steel Free Standing Drawer Freezer Refrigerator monogram com 31 46547 225D1974P007...

Page 2: ...e to leave these instructions with the Consumer Note to Consumer Keep these instructions with your Owner s Manual for future reference WARNING This appliance must be properly grounded See Grounding th...

Page 3: ...al Locations The opening must be prepared with the electrical and water supply located as shown Additional Specifications A 115 volt 60Hz 15 or 20 amp power supply is required An individual properly g...

Page 4: ...on and place under the refrigerator where you are working GROUNDING THE REFRIGERATOR IMPORTANT Please read carefully FOR PERSONAL SAFETY THIS APPLIANCE MUST BE PROPERLY GROUNDED The power cord of this...

Page 5: ...s with a pencil nail or awl Floor Concrete 2 Holes Floor Wood 2 Holes Base Bracket on the Refrigerator RH Holes 7 1 4 Rear RH Corner of Cabinet Wall RH Side of Refrigerator Locator Template Sheet 2 Wa...

Page 6: ...e 2 or preferably 4 10 16 hex head screws tightly into place as illustrated in Figure 3 Figure 3 Attachment to Wall and Floor STEP 2B INSTALL ANTI TIP BRACKET CONT CONCRETE Wall and Floor Construction...

Page 7: ...OVE THE FREEZER DRAWERS The freezer drawers can be removed if needed to fit through tight areas Read these instructions completely and carefully REMOVE THE BASKET A Open the freezer drawer until it st...

Page 8: ...om each side of the rail assembly B Remove the four screws attaching the slide brackets to the connector brackets C Remove the connector brackets and place aside D Tilt the bottom drawer toward the re...

Page 9: ...only Move the refrigerator indoors Place refrigerator close to the installation location 9 REPLACE THE FREEZER BASKET Replace the top drawer freezer basket B Drive the bottom outside screw into the do...

Page 10: ...assembly and drive screws into slide bracket two screws on each side 10 STEP 8 REPLACE THE FREEZER DRAWERS CONT REPLACE THE 2 PIECE BASKET Place the rear of the basket onto the metal slide brackets Th...

Page 11: ...quired for automatic icemaker operation The water pressure must be between 40 and 120 p s i Route GE SmartConnect Refrigerator Tubing or 1 4 OD copper tubing between house cold water line and the wate...

Page 12: ...ert the end of the copper tubing into the refrigerator connection at the back of the refrigerator as far as possible Hold the tubing in place and tighten the fitting If you are using GE SmartConnect t...

Page 13: ...ve as a stabilizing brake to hold the refrigerator securely in position during operation and cleaning The leveling legs also prevent the refrigerator from tipping Turn the leveling legs clockwise to r...

Page 14: ...It will take 2 3 days to fill the ice bin NOTE In lower water pressure conditions the water valve may turn on up to 3 times to deliver enough water to the icemaker STEP 18 TEMPERATURE CONTROLS The tem...

Page 15: ...15 Notes...

Page 16: ...in your area call 1 800 444 1845 NOTE Product improvement is a continuing endeavor at General Electric Therefore materials appearance and specifications are subject to change without notice 31 46547...

Reviews: