• Mark an additional hole at each end of the bracket. If one
of the studs is closer to the end of the bracket, mark an
additional hole towards the center of the bracket.
• Drill 1/2” holes into the wall board at the locations
marked for the toggles to be mounted (not the stud
markings).
• Drill 3/16” holes into wooden studs where marked. If steel
stud construction, drill 1/2” holes into the studs where
marked. You will use 2 toggles with the metal studs.
Line on Wall
Center
Anti-Tip Wall Bracket
Bolt
Wall Toggle
Drywall or
Steel Stud
Install Screws and Bolts:
• Have someone hold the wall bracket centered in place
with each of the holes aligned with the correct opening
in the bracket and level with the horizontal line.
• Insert the lag screws through the bracket and into the
stud. Tighten with a wrench.
• Insert the bolts into the toggle by hand until snug.
Tighten with a wrench.
Install Wall Toggles:
The wall toggles and bolts can be ordered as Service Kit
#WR49X10193. Wall toggles are installed in the drywall
and metal studs for stability. Install the wall toggles as
follows:
• Drill 1/2” holes at the wall markings made in the holes at
the ends of the wall bracket.
• Hold the metal channel flat against the plastic straps
and slide the channel through the hole.
• Gently pull back at the ends of the plastic straps to make
the channel rest flush behind the wall.
• Hold the ends of the straps in one hand and slide the
plastic cap along the straps until the flange of the cap is
flush with the wall.
• Place your thumb between the plastic straps and bend
up and down to snap the straps off at the wall.
Installation Instructions - Flush Installation
33
Plastic Straps
Metal Channel
Wood Stud
Lag Screw
Anti-Tip Wall Bracket
Cap
STEP 5 INSTALL ANTI-TIP BRACKET (cont.)
Summary of Contents for ZIF360NHLH
Page 5: ...Instructions for Standard Installation 5 ...
Page 22: ...Instructions for Flush Installation 22 ...
Page 38: ...Instructions for Stainless Steel Installation 38 ...
Page 50: ...50 Notes ...
Page 51: ...51 Notes ...