Design Information
MODELS AVAILABLE
Model ZV850, 360 CFM
Model ZV855, 500 CFM
These hoods may be installed to vent to the outdoors,
or they may be installed for recirculating operation.
All necessary parts for recirculating operation are
supplied with the hood. No kits required.
•
These vent hoods can be installed over any 30” or 36”
Monogram electric or gas cooktop except Monogram
Professional cooktops or ranges larger than 30”.
•
Reversible duct covers accommodate recirculating
operation.
•
The telescopic duct covers conceal the ductwork
running from the top of the hood to the ceiling.
•
The supplied duct cover is sized to reach ceiling heights
over 8 feet. See the table on page 8.
PRODUCT DIMENSIONS AND CLEARANCES
The vent hood must be installed 24
″
minimum and
30
″
maximum above the cooking surface.
NOTE:
Installation height should be measured from
the cooking surface to the lowest part of the hood.
ZX8510SPSS Duct Cover Accessory
This accessory is available for installation with ceiling
heights of 8
′
7
″
to over 10 feet. See the table on page 8.
The duct cover accessory must be on-site with the
hood at the time of installation.
24” Minimum
30” Maximum
36" Minimum
*Height
to Ceiling
8-1/4"
27-1/2”
35-3/8
ļ
(excluding utensil rods)
36-1/2
ļ
(including utensil rods)
CONTENTS
Design Information
Models Available ................................................................................3
Product Dimensions..........................................................................3
Advance Planning
Ductwork Planning ..........................................................................4
Ceiling Framing for Adequate Support ..................................4
Installation Preparation
Duct Fittings..........................................................................................5
Power Supply ......................................................................................6
Tools and Materials Required ......................................................6
Remove the Packaging ..................................................................7
Check Installation Hardware ......................................................7
Determine Installation Height......................................................8
Install Ceiling Support Structure ........................................9–11
Installation Instructions
Installation – Vented to the Outside ..............................12–16
Step 1, Mount Template ..............................................................12
Step 2, Install Upper Support Frame......................................12
Step 3, Install Lower Support Frame......................................12
Step 4, Secure Wiring ....................................................................13
Step 5, Size and Install Ductwork ............................................13
Step 6, Install Decorative Duct Covers..................................14
Step 7, Install Hood ........................................................................15
Step 8, Connect Electrical............................................................15
Step 9, Slide Duct Cover
Down, Install Side Utensil Rods ................................................15
Step 10, Install Filters ....................................................................16
Step 11, Finalize Installation ......................................................16
Installation Instructions
Installation – Recirculating..................................................17–21
Step 1, Mount Template ..............................................................17
Step 2, Install Upper Support Frame......................................17
Step 3, Install Lower Support Frame......................................18
Step 4, Secure Wiring ....................................................................18
Step 5, Size and Install Ductwork ............................................18
Step 6, Install Decorative Duct Covers..................................19
Step 7, Install Hood ........................................................................20
Step 8, Connect Electrical............................................................20
Step 9, Slide Duct Cover
Down, Install Side Utensil Rods ................................................20
Step 10, Install Filters ....................................................................21
Step 11, Finalize Installation ......................................................21
3
Summary of Contents for ZV850
Page 42: ...Notes 42 ...
Page 63: ...63 Notas ...