Installation Preparation
DETERMINE INSTALLATION HEIGHT
•
Telescopic duct covers are provided to conceal
the ductwork running to the ceiling.
•
This hood can be installed for vented or
recirculating operation. All necessary parts are
shipped with the hood.
NOTE:
Installation height should be measured from
the cooking surface to the bottom of the hood.
The vent hood must be installed 24
″
min. and
30
″
max. above the cooking surface. The hood
installation height, from the cooking surface to the
bottom of the hood, depends upon ceiling height
and duct cover limitations.
24” Minimum
30” Maximum
36" Minimum
DUCT COVER DIMENSIONS
ZX8510SPSS Duct Cover Accessory
The accessory is available for installation with ceiling
heights of 8
′
7
″
to over 10 feet. This accessory
consists of two 26-1/4
″
duct covers and one 31
″
upper support frame piece.
*Possible
*Possible
VENTED
RECIRCULATING
Ceiling Installation
Installation
Height
Height
Height
7
′
11
″
24
″
24
″
8
′
24
″
to 25
″
24
″
to 25
″
8
′
1
″
24
″
to 26
″
24
″
to 26
″
8
′
2
″
25
″
to 27
″
24
″
to 27
″
8
′
3
″
26
″
to 28
″
24
″
to 28
″
8
′
4
″
27
″
to 29
″
24
″
to 29
″
8
′
5
″
28
″
to 30
″
24
″
to 30
″
8
′
6
″
29
″
to 30
″
25
″
to 30
″
8
′
7
″
30
″
26
″
to 30
″
8
′
8
″
27
″
to 30
″
8
′
9
″
28
″
to 30
″
8
′
10
″
29
″
to 30
″
8
′
11
″
30
″
8
′
7
″
24
″
24
″
8
′
8
″
24
″
to 25
″
24
″
to 25
″
8
′
9
″
24
″
to 26
″
24
″
to 26
″
8
′
10
″
24
″
to 27
″
24
″
to 27
″
8
′
11
″
24
″
to 28
″
24
″
to 28
″
9
′
24
″
to 29
″
24
″
to 29
″
9
′
1
″
24
″
to 30
″
24
″
to 30
″
9
′
2
″
24
″
to 30
″
24
″
to 30
″
9
′
3
″
24
″
to 30
″
24
″
to 30
″
9
′
4
″
24
″
to 30
″
24
″
to 30
″
9
′
5
″
24
″
to 30
″
24
″
to 30
″
9
′
6
″
24
″
to 30
″
24
″
to 30
″
9
′
7
″
24
″
to 30
″
24
″
to 30
″
9
′
8
″
25
″
to 30
″
24
″
to 30
″
9
′
9
″
26
″
to 30
″
24
″
to 30
″
9
′
10
″
27
″
to 30
″
24
″
to 30
″
9
′
11
″
28
″
to 30
″
25
″
to 30
″
10
′
29
″
to 30
″
26
″
to 30
″
10
′
1
″
30
″
27
″
to 30
″
10
′
2
″
28
″
to 30
″
10
′
3
″
29
″
to 30
″
10
′
4
″
30
″
*Based on 36
″
countertop height.
8
9-7/16
″
A
C
CESSOR
Y
ZX90010
Low
er
Duct
26.25
″
Upper
Duct
26.25
″
ZX8510SPSS
–
A
C
CESSOR
Y
DUCT
C
O
VERS
A
C
CESSOR
Y
ZX90010
Upper
Frame
31
″
+
Su
pp
lie
d
Lo
w
er
F
ra
m
e
ZX8510SPSS
–
A
C
CESSOR
Y
UPPER
FRAME
Low
er
Duct
18
″
Upper
Duct
18
″
Low
er
Frame
20.75
″
Upper
Frame
20.75
″
ZV850/ZV855
Installation Heights
15-3/4
″
SUPPLIED
FRAME
SUPPLIED
DUCT
C
O
VERS
Summary of Contents for ZV850
Page 42: ...Notes 42 ...
Page 63: ...63 Notas ...