background image

9

 1  INSTALL FRAMING 

             

FOR HOOD SUPPORT

IMPORTANT: Framing must be capable  

of supporting 100 lbs.

Installation Instructions

If drywall is present, mark the screw hole locations for the 

top mounting brackets. Remove the template.

• Cutaway enough drywall to expose 2 vertical studs at the 

bracket location indicated on the template.

• Install a horizontal support at least 1" x 6" between two 

wall studs at the top bracket installation location

. The 

horizontal support must be flush with the room side of 

the studs.

 Use cleats behind both sides of the support 

to secure the support to wall studs. 

• Reinstall drywall.

Centerline of 

Installation

Space

8" Min. Opening for Ductwork

View From Rear

Cleats

1" x 6" Min.

Mounting

Support

 2  INSTALL MOUNTING BRACKETS

This vent hood must be secured to the horizontal support or 

wall studs.

• With the template taped in place, use a punch to mark 

all mounting screw locations.

• Drill 1/8" pilot holes at the 6 punched locations.

• Remove the template.

• The 4 support bracket holes must enter studs or the 

horizontal support.

Note: 

Screws “A” and “B” 

are pre-assembled onto 

the brackets. Do not 

remove these screws.

Screws

“B”

Screws

“A”

• Secure the mounting brackets to the wall studs with 

wood screws provided.

Summary of Contents for ZV950

Page 1: ...If you have questions call 800 GE CARES or visit our website at www monogram com Installation Instructions ZV950 36 Stainless Steel Vent Hood ...

Page 2: ...CAUTION To reduce risk of fire and to properly exhaust air be sure to duct air outside Do not vent exhaust air into spaces within walls or ceilings or into attics crawl spaces or garages PRUDENCE Il faut prendre soin d installer un conduit vers l extérieur pour réduire le risque d incendie et pouvoir évacuer l air correctement Il ne faut pas évacuer l air dans l espace entre les parois d un mur un...

Page 3: ... 36 rangetop and 30 or 36 range 10 Height to Ceiling 35 5 8 25 The supplied duct cover fits 8 ft to 10 ft ceilings The vent hood must be installed 24 min and 30 max above the cooking surface The hood installation height from the cooking surface to the bottom of the hood de pends upon ceiling height Installation Height Depending on Ceiling Height 36 Min Cooking surface to bottom of hood should be 2...

Page 4: ...25 1 2 to 30 25 1 2 to 30 25 1 2 to 30 25 1 2 to 30 25 1 2 to 30 25 1 2 to 30 25 1 2 to 30 25 1 2 to 30 26 1 2 to 30 26 1 2 to 30 26 1 2 to 30 26 1 2 to 30 26 1 2 to 30 30 min 30 min 30 min 30 min 30 min 30 min 30 min Duct Cover ZX14SDSS SUPPLIED OPTIONAL ACCESSORIES ZX14SDSS optional stainless steel duct cover is available for ceiling heights greater than 10 ft and up to 14 ft Order the optional ...

Page 5: ...ircuit breaker or time delay fuse Wiring must be 2 wire with ground If the electrical supply does not meet the above require ments call a licensed electrician before proceeding Use metal ductwork These hoods must use 8 round duct It can transition to 3 1 4 x 12 reducing the maxi mum equivalent duct length to 75 feet Install a wall cap with damper or roof cap at the exterior opening Order the wall ...

Page 6: ...lexible ducting If flexible metal ducting is used all the equivalent feet values in the table should be doubled The flexible metal duct should be straight and smooth and extended as much as possible Do NOT use flexible plastic ducting Total Duct Run Note Any home ventilation system such as a ventilation hood may interrupt the proper flow of combustion air and exhaust required by fire places gas fu...

Page 7: ...EMOVE THE PACKAGING The hood is shipped secured to a shipping board with 4 screws Remove the 4 screws Two screws are located at the top of the hood Two are located at the bottom of the hood behind the grease filters A shipping bracket which supports the blower must also be removed It is secured with two screws All screw im pressions are Phillips Remove all packaging the duct covers and accessories...

Page 8: ...ead Leveling Screws Duct Cover Bracket 6 Wall Fasteners 2 piece Decorative Duct Cover dimension shown for reference only Tape the template in position along the penciled line CHECK TO BE SURE THE TEMPLATE IS LEVEL Ceiling ducting If ductwork will vent straight up to the ceiling Use a level to draw a line straight up from the centerline on the template to the ceiling Measure 6 1 4 from the back wal...

Page 9: ...se cleats behind both sides of the support to secure the support to wall studs Reinstall drywall Centerline of Installation Space 8 Min Opening for Ductwork View From Rear Cleats 1 x 6 Min Mounting Support 2 INSTALL MOUNTING BRACKETS This vent hood must be secured to the horizontal support or wall studs With the template taped in place use a punch to mark all mounting screw locations Drill 1 8 pil...

Page 10: ...ting brackets 6 Using two large flat washers supplied install wood screws or wall fastener screws 7 Tighten screws B located at the top of the mounting bracket against the hood to clamp the position Do not overtighten screws 3 INSTALL DUCT BRACKET The duct bracket must be installed against the ceiling This bracket will hold the decorative duct cover in place at the top Install the 2 small screws i...

Page 11: ...e wiring is not 2 wire with a ground wire a ground must be provided by the installer When house wiring is aluminum be sure to use U L ap proved anti oxidant compound and aluminum to copper connectors AVERTISSEMENT Si la maison n est pas câblée avec deux fils et un fil de terre l installateur doit installer un fil de terre Quand les fils sont en aluminium il faut prendre soin d utiliser des con nec...

Page 12: ...eck the left side filter is making contact with the filter switch 9 FINALIZE INSTALLATION Remove the protective film covering the control panel on the front face of the hood and any other packaging materials Refer to the Owner s Manual for operating instructions Note While performing installations described in this book safety glasses or goggles should be worn For MonogramTM local service in your ...

Reviews: