31-2000734 Rev. 4
9
NEW CONSTRUCTION, PRE-PLANNING, OR REMODELING
NOTE:
For existing instruction, skip to the next section.
FOR TOP VENTING
Ŷ)RUGXFWHGLQVWDOODWLRQWKURXJKWKHWRSWKH´
diameter hole for the duct in the ceiling must be
centered 6-1/4” away from the finished rear wall in the
installation space.
FOR BACK VENTING
Ŷ)RUGXFWHGLQVWDOODWLRQWKURXJKWKHE
x13-1/4”W cut out for the duct in the wall must be
centered in the installation space, left to right and
located 5-7/8” above intended install height from
bottom of the hood.
Installation Preparation
6-1/4”
5-7/8”
10-1/2”H x13-1/4” W
Bottom of Hood
Ŷ7KHKRRGMXQFWLRQER[NQRFNRXWLVORFDWHG´WRWKH
left from center of the hood. Ensure enough wire length is
available to make electrical connection.