Page | 9
35HP
–
Op Manual Rev 0 3/28/12
All specifications are subject to change without notice.
STEP 5: (B) Install Debris Elbow to stack (12
) 3/8” x 1¼”,
(24
) 3/8” flat washers,
(12
) 3/8” lock washers and
(12
) 3/8” nuts
(
C) Install Metal Discharge Hose (1) Clamp 12
” Heavy Duty
Fasten with (6) ½ x 1” bolts
(D) Install Boom assembly on to Debris stack (No hardware required)
Important Note: Don’t Stand on Unit.
Warning: Heavy weight. May need assistants installing.
Step 1: Slide boom up into top mount
position
Assembly Instructions, cont.
Solutions
Step 2: Slide bottom of boom into lower
mount position