Page | 10
35HP
–
Op Manual Rev 0 3/28/12
All specifications are subject to change without notice.
STEP 6: (A) Install Intake Hose to Housing (2) Hose Clamps 16
”
(B) Install Hose Support Band
(
Approximately 6 ½’ from Intake Housing)
(1) 3/8” x 3 ½” bolt and (1) 3/8” lock nut
(E) Install Support chain (4’) between Hose and Boom
(C) Install Handle into Nozzle
(2) 3/8” x 1 ¼” and (2) 3/8” nuts
Important Note: Handle needs to face up and back
(D) Install Nozzle into Hose (1) 16” Hose Clamp
Assembly Instructions, cont.
Solutions