© 2011 Monte Carlo Fan Company
1/9/2012
3
Insert downrod into motor yoke. Next, insert
clevis pin through yoke and downrod and secure
with cotter pin. (see inset)
Before you begin installing the fan, Switch power off
at Service panel and lock service disconnecting
means to prevent power from being switched on ac-
cidentally. When the service disconnecting means
cannot be locked, securely fasten a prominent warn-
ing device, such as a tag, to the service panel.
Before installing this fan make sure the outlet
box is properly installed to the house structure.
To reduce the risk of fire, electric shock, or per-
sonal injury, mount to outlet box or supporting
system acceptable for fan support.
(Mounting must support at least 35 lbs.)
Install the Mountiing Bracket to the Outlet box.
Use only the screws provided with the out-
let box.
Thread wire thru canopy.
3
2
1
4
6
Thread wire thru downrod.
5
Carefully lift fan assembly onto mounting
bracket. Rotate fan so that the notch on the ball
engages the ridge in the mounting bracket. This
will allow hands-free wiring.
8
7
For Canadian installation and for USA fan and
light kit combinations over 35 lbs, in both flush
and downrod mode the safety cable must be in-
stalled into the house structure beams using the
3” lag screws,washers, and lock washers. pro-
vided. Make sure that when the safety cable is
fully extended the leadwires are longer than the
cable and no stress is placed on the leadwires.
9
Safety cable installation
Safety Cable
Lag Screw
Tighten both yoke set screws to further secure
downrod.
safety
cable
3” lag
screw
lock
washer
washer
Summary of Contents for 5AB52XX Series
Page 6: ...Jan 2012 New format ...