© 2013 Monte Carlo Fan Company
11/15/2013
3
Before you begin installing the fan, Switch
power off at Service panel and lock service dis-
connecting means to prevent power from being
switched on accidentally. When the service dis-
connecting means cannot be locked, securely
fasten a prominent warning device, such as a
tag, to the service panel.
Before installing this fan make sure the outlet box is
properly installed to the house structure. To reduce
the risk of fire, electric shock, or personal injury,
mount to outlet box or supporting system acceptable
for fan support. (Mounting must support at least 35
lbs.)
Use metal outlet box suitable for fan support
(must support 35 lbs). Before attaching fan to
outlet box, ensure the outlet box is securley
fastened by at least two points to a structural
ceiling member ( a loose box will cause the fan
to wabble).
Use only the screws provided
with the outlet box.
Idea height from flow to fan blades is 7 to 9
feet.
Insert downrod into yoke on top of the Fan
Body. Align the hole in the Downrod with the
hole in the Yoke. Insert the Pin through the
Yoke and Downrod until the point appears on
the other side. Install the Keeper Pin
Tighten the 2 Set screws on the Yoke
once the downrod is in place. Check
motor for shipping stabilizers and re-
move if present.
Tread leadwires and safety cable first
through the canopy disk, Canopy and
lastly downrod.
3
2
1
5
6
4
Canopy disk
Downrod
Canopy
Yoke
Cross Pin
Keeper
Pin
Hang assembled fan from the mounting bracket in-
stalled to ceiling in previous step. Make sure the fan
is hanging straight. Rotate fan until the tab on the
Mounting bracket engages the slot on the Downrod
Ball. This must be done to prevent the fan body from
rotating when the blades are in motion.
7
Make sure the studs protruding from the
bottom of the Mounting bracket are in-
stalled with threads all the way through
the bracket.
9
For Canadian installation and for USA fan and light
kit combinations over 35 lbs, in both flush and
downrod modes the safety cable must be installed
into the house structure beams using 3” lag
screws, washers and lock washers provided. Make
sure that when the safety cable is fully extended
the lead wires are longer than the cable and no
stress is placed on the lead wires.
Note
:If Installing The Secondary Support Safety
Cable in the U.S., Do Not Remove Knockouts In
The Outlet Box.
8
Safety cable installation
Safety Cable
Lag Screw
safety
cable
3” lag
screw
lock
washer
washer