H36PVN Power Vent Indoor Gas Fireplace
Page 16
XG0649 - 031511
Installation
CAUTION!
Vent terminations can be very hot. The termination is to be installed higher than 7 feet above a public walkway.
Do not obstruct, or attempt to conceal, the vent termination. These actions will affect the operation of the fireplace, and may be hazardous.
In heavy snow areas, take extra care to prevent snow buildup from obstructing the vent termination.
■ Vent terminations can be very hot. The
termination is to be installed higher than 7 feet
above a public walkway.
■ Do not obstruct, or attempt to conceal, the vent
termination. These actions will affect the operation
of the fireplace, and may be hazardous.
■ In heavy snow areas, take extra care to
prevent snow buildup from obstructing the vent
termination.
CAUTION
XW2026
Step 8.
Install the Power Vent Power / communication harness . Hold
the Power Vent in close proximity of the assembled Rough-in Kit,
and plug in the Power Vent communication / Power Cord .
(Note the
direction and orientation of the pins inside the Power Vent connector,
snap together). (
Figure 7f
)
.
Step 9.
Install the Power Vent . Place the Power Vent into the Rough-in
frame, aligning the Power Vent into final position . Ensure the Harness
is placed down in the Rough-in box when placing the Power Vent .
(Secure the Power Vent in Place with the supplied hardware).
Figure 7f. (Installation of Power Vent communication harness)
TOP of Power Vent,
(Note Quantity of
louvers).
Note louver
direction
Tightened hardware,
4-pcs.
Communication
Harness.
Figure 7g. (Completed Installation of Power Vent)
Figure 7e. (Assembled Rough-in Kit)
Tightened hardware, 6-pcs.
Installed Power Vent
Connector