35
Installation
XG0228 - 021419
STEP 8:
Install Front (3) three of the supplied (5) five faux ceramic
"D" Rocks as shown. Note cut surfaces of Rocks.
STEP 9:
Install the last (2) two faux ceramic "D" Rocks as shown in
Figure 32c. Note cut surfaces of Rock toward back of firebox.
STEP 12:
Install the first faux ceramic "E" Rocks on top of the
lower level of rocks. Continue placement of ceramic "E" Rocks as
shown.
STEP 10:
Begin placement of the faux "E" ceramic rocks in the
Left side of the firebox. Note approximate placement.
STEP 11:
Continue placing the faux "E" ceramic rocks to the Right
side of the firebox. Note approximate random locations.
Figure 23.g
Place (3) three faux "D" ceramic Rocks between burner and front of firebox frame.
(flat surfaces of rock against the front of door opening and bottom pan of the fireplace). Note
similar size of rock diameters.
Figure 23.m
Completed lower layer of ceramic Rock.
Figure 23.h
Place the remaining (2) two faux "D" ceramic Rocks on top of faux the "A" (3 in 1
ceramic rock.) (flat surfaces of rock against back of firebox.
Figure 23.n
Place the first Top faux Rock.
Figure 23.o
Place the second Top faux Rock between the far left and centre inlet Ports.
Figure 23.p
Place the third Top faux Rock between the far right and centre inlet Ports.
Figure 23.q
Place the forth Top faux Rock on top of the previous (2) two Rocks.
Figure 23.i
Left side of firebox.
Figure 23.k
Right side of firebox.
Figure 23.j
Continue placing.
Figure 23.l
Continue placing.
ROCK "D"
ROCK "D"
ROCK "D"
ROCK "D"
ROCK "D"