H*42DF Indoor Gas Fireplace
Page 17
XG0148 - 151123
Installation
A - Termination
PTO4 (3" Length)
PTO4F (3" Length)
PVTK1SS
B - Frame Kits
MSR (Stucco Frame)
MOSR (Stucco Frame)
BSR-4 (4" Brick Frame)
BSR-6 (6" Brick Frame)
C - Flex Sections
PFL - 1 (12" f/f Section)
PFL - 18 (18" f/f Section)
PFL - 2 (24" f/f Section)
PFL - 3 (36" f/f Section)
PFL - 4 (48" f/f Section)
PFL - 6 (72" f/f Section)
D - Rigid Sections
PXT - 5 (5" f/f Section)
PXT - 10 (10" f/f Section)
PXT - 20 (20" f/f Section)
PEXT - 1 (12" f/m Section)
PEXT - 2 (24" f/m Section)
PEXT - 3 (36" f/m Section)
PEXT - 4 (48" f/m Section)
PEXT - 6 (72" f/m Section)
E - Elbows
PEL-90MM (m/m 90º Elbow)
PEL-90FF ( f/f 90º Elbow)
PEL-90FM ( f/m 90º Elbow)
PEL-45FM ( f/m 45º Elbow)
F - Support Ring & Plate PSPXT-8
G - Firestop
FS-8
H - Roof Flashing
PRF-7 (1/12 - 7/12 pt.)
PRF-12 (7/12 - 12/12 pt.)
I - Heat Shield
RHS101
J - Heat Guard
MTKOG
Connection and installation of the vent components
should adhere to the following guidelines:
Montigo recommends the use of a flex section for the final
pipe connected directly to the fireplace offering greater
flexibility of installation and absorption of movement.
Firestops must be installed as required by National & local
codes
.
Montigo recommends that all exterior corners and joints be
sealed with exterior caulking. However, we encourage you to
consult your Building Envelope Engineer or Waterproofing
Consultant for further recommendations.
Section 3-3-2:
Venting Components
The following components and associated Montigo part num-
bers for installation of a roof or wall mounted termination. Use
only Montigo Vent Components. Use of non-Montigo parts will
VOID the warranty and may impede operation of the fireplace.
Use any combination of rigid and flex pipe as required and in
any orientation (Male connectors can face in any direction).
Flex sections may be stretched up to 50% of their total length
(e.g. a 24” section maybe stretched to 36”).
Connect all vent sections using a minimum of three sheet
metal screws on the outer pipe flue.
Ensure the pipe ends male to female slide in a minimum of
1 1/2” of overlap.
Ensure all horizontal runs are supported with a minimum
of 3 supports per 10’ of venting.
When hanging/supporting venting, ensure that 1” clearance
is maintained on sides and bottom of vent runs and 2” above
horizontal vent runs to any combustible material.
Rigid pipe may be cut less than half way from the female
end only.
Ensure when cutting sections of rigid pipe to maintain
integrity of internal supports.
Place the springs, supplied with the pipe kit, between the
outer and inner pipes to keep the pipes separate and avoid
any possible hot spots.
IMPORTANT:
Please Refer to your Building Envelope Engineer
or Waterproofing Consultant for a review of ALL
penetrations through exterior walls or the roof.