Circuit
All situated in the distribution panel. To switch the ring main (plug sockets) on,
push the switch in when the system is on, the LED next to the switch will light up.
The maximum loading on this circuit is the same as the total system
and if the
load exceeds this it will switch off automatically.
Battery charge
For charger operation consult operators manual.
Water heater
If factory fitted this will be a 1KW type. To switch on operate as ring main, the
temperature of the water can be adjusted on the thermostat located in the top of
the heater element. Ensure the fresh water system is switched on before operating
the water heater.
Spare switches
Can be used for any additional requirement but the load rating should be checked
if used.
Connection instructions
1 Check that the RCCB and the Double Pole Circuit Breaker Switch is in the off
position.
2 Plug in the Shore Support Socket and switch on supply from the shore.
3 Test RCCB then reset.
4 Check polarity is correct.
5 Switch on double pull circuit breaker switch and check voltage on meter.
6 Switch on individual output systems as required.
If any of the switches will not stay in, do not hold them in. This will generally indicate that
*
the circuit is
that size breaker or that there is a fault in the system or appliance
being used in the particular circuit.
Issue 3 Page 5.3
Summary of Contents for 336 MK1
Page 1: ......
Page 23: ...Cobra 5R ISS Prestige Steering System Page 3 6 Issue 3...
Page 24: ...Constellation 400 Steering System Issue 3 Page 3 7...
Page 28: ...Moody 336 Engine System Installation Issue 3 Page 4 13...
Page 40: ...Moody 336 Freshwater System Page 5 16 Issue 3...
Page 44: ...a to TO n yi NJ o I o 0 C 5 V e n OJ...