Shanghai AMP & MOONS’ Automation Co. Ltd.
No.168 Mingjia Road, Industrial Park North Minhang District,
Shanghai 201107, P.R. China
Tel: 86-21-52634688 Fax: 86-21-62968682
E-mail: info@moons.com.cn
Web: www.moonsindustries.com
Service Center
+86-400-820-9661
4
Configure the Drive
•
Apply power to the drive
•
The software will recognize the drive & display the model
& firmware version
• Follow the steps on the ST Configurator screens to set
up the Motor and Motion & I/O
3
Connect the Power Supply
•
Using the connector supplied to connect the AC power
supply per the diagram below. For Line (L) and Neutral
(N), use 16AWG wire. For Earth Ground (
), use
14AWG wire.
•
Care should always be taken when working with high
voltages.
•
In regions where the single-phase supply is higher, an
auto transformer can be used to drop the voltage to the
correct level.
2
Install the Software
• Download and install the ST Configurator
Software from the MOONS’ website.
•
Launch the software by clicking Start...
Programs ... MOONS’
•
Connect the drive to the PC using the
CAT5 Ethernet cable
1
Requirements
You will need these items to set-up the MSSTAC5-2V:
•
94-265V AC power supply
• a small flat blade screwdriver for tightening the
connectors (included)
•
a PC running Microsoft Windows XP, Vista, or Windows 7
•
a CAT5 Ethernet programming cable
Safety Instructions
• Only qualified personnel should assemble, install, operate, or maintain this equipment.
•
Read all available documentation before assembly and operation.
•
It is vital to ensure that all system components are connected to earth ground.
•
This product contains electrostatically sensitive components that can be damaged by incorrect
handling.
MSSTAC5-2V
EtherNet Step drive
Quick Set-Up Guide
PLC,Sensor,I/O
MSSTAC5-S/Q
PC
AC
Source
TCP/IP
PLC,Sensor,I/O
Stall Detection&Prevention
(
Option
)