Settings
A : Distribution Settings
Very precise sowing requires a calibration test. Make sure your scales are accurate
Setting up the calibration test
Preparing the calibration test
•
Use accurate scales and a container.
•
Before carrying out the test, check that no-one is standing near the seed drill except the operator.
Procedure
•
Open the trays
(1)
and
(2)
and push them down and forward in order to lower them below the
distribution points.
•
Fit the calibration handle
(3)
onto the variator shaft.
•
Check that the distributions in use are engaged.
•
Perform your calibration test according to the recommendations issued in the following pages.
•
To empty the seeds from the tray more easily, open the flap slightly lifting the lever
(4).
•
Raise the trays back into guard position.
21
Summary of Contents for 240G
Page 9: ...Safety Instruction Decals Safety Stickers 9 ...
Page 10: ...Safety Instruction Decals 10 ...
Page 11: ...Safety Instruction Decals 11 25 ...
Page 12: ......
Page 22: ...Settings A Distribution Settings Size metres 2 40 3 00 Turns 62 5 50 22 ...
Page 37: ...Flow Rate Tables Calibration Procedure 37 ...
Page 38: ...Flow Rate Tables Calibration Procedure 38 ...
Page 39: ...Flow Rate Tables Calibration Procedure 39 ...
Page 40: ...Flow Rate Tables Calibration Procedure 40 ...
Page 43: ...Grassland Parts booklet 2007 grassland seeding line ...
Page 45: ...Grassland Main Chassis ...