Start Up
12
B : Operator Check list
It is the owner / drill operators responsibility to set up the drill for:
1. Sowing depth according to conditions in each soil type and pre worked condition
2. Tramline bout number to suit tramlines
3. Tramline
track
width
4. Number of rows shut off whilst tram lining
5. Marker width setting to allow matching of bouts
6. Operation of half width shut off
7. Folding the machine in and out of work without damage
It is also the owner / operator’s responsibility to check the operation of the various
functions of the machine between each hopper fill, or at least once every hour to check the
machine is operating correctly.
Summary of Contents for Tandem Uni-Drill DP400A
Page 9: ...Safety Regulations Safety Stickers 9 ...
Page 17: ...Start Up G TURBINE 17 ...
Page 23: ...Settings A Distribution Settings 23 ...
Page 32: ...Settings H Tramline Track Width 32 ...
Page 41: ...Flow Rate Tables Calibration Procedure 41 ...
Page 42: ...Flow Rate Tables Calibration Procedure 42 ...
Page 43: ...Flow Rate Tables Calibration Procedure 43 ...
Page 44: ...Flow Rate Tables Calibration Procedure 44 ...
Page 45: ...Flow Rate Tables Calibration Procedure 45 ...
Page 48: ...DP400A and DP600A Parts booklet 2002 seeding line ...
Page 52: ...2002 DP600A markers ...
Page 54: ...Marker Circuit Diagram ...
Page 55: ...W Seed box hopper extension ...
Page 56: ...W Seed box Peg Wheels ...
Page 57: ...W Seed box Distributor Assembly ...
Page 58: ...W Seed box Distributor Assembly ...
Page 59: ...W Seed box Variator Assembly W Seed box Variator Assembly ...
Page 60: ...W Seed box half width shut off ...
Page 61: ...W Seed box Venturi System ...
Page 62: ...W Seed box Drive Wheel Assy ...
Page 63: ...W Seed box Wind turbine Assy ...
Page 64: ...W Seed box Air Intake ...
Page 65: ...W Seed box RDS system ...