Settings
24
A: Distribution Settings
Carrying out the calibration test
1) Fixed unit test
1
Set the distribution as indicated in the manual (plugs, baffle, plate, shutters etc.).
2
Put the grain in the seed box
on the day of sowing
(5 kg of rape, 150 kg of cereal) and carry
out the following test.
3
Set
the variator to the mark indicated in the table (see flow rate table and calibration).
4 Start
distribution: a
minimum
of
25 turns
of the crank (the trough may be filled), or
100 turns
for rape.
5 Carry
out
the test by completing the appropriate number of turns for the width of the seed drill.
N B
Turn steadily at
1 turn per second.
6
Weigh
the quantity collected in the trough using accurate scales.
7
Multiply by 40
to obtain the quantity per hectare or use the calculator (see next page).
8 Correct
the variator setting (lower the lever completely then bring it back up to the required
value).
9 Reset
the area meter to zero after the calibration test.
10
The most representative test is one carried out under real working conditions.
After sowing a hectare, carry out a further check (proceed as above from step
5
).
Checking the distribution system
Distribution of seed to the seed tubes should be checked at regular intervals through out the day, for
example every hour.
•
Check both sides of the drill appear to be delivering the same amount of seed to each coulter.
•
Manually turn the drive wheel with the fan running to ensure seed is blown out of each coulter.
•
Engage tramline mechanism and repeat the above procedure, Note the voltage the tramline system
receives from the tractor affects the way in which the tramline will work
. IF THE TRACTOR IS
SUPPLING AN INVERSE POLARITY VOTAGE TO THE TRAMLINER, THE TRAMLINE
MECHANISM WILL WORK IN THE OPPOSITE MANNER ,i.e TRAMLINE WHEN IT SHOULD’NT
AND NOT TRAMLINE WHEN IT SHOULD
•
When calibrating the seed box check each side of the drill is delivering the right amount of seed.
Summary of Contents for Tandem Uni-Drill DP400A
Page 9: ...Safety Regulations Safety Stickers 9 ...
Page 17: ...Start Up G TURBINE 17 ...
Page 23: ...Settings A Distribution Settings 23 ...
Page 32: ...Settings H Tramline Track Width 32 ...
Page 41: ...Flow Rate Tables Calibration Procedure 41 ...
Page 42: ...Flow Rate Tables Calibration Procedure 42 ...
Page 43: ...Flow Rate Tables Calibration Procedure 43 ...
Page 44: ...Flow Rate Tables Calibration Procedure 44 ...
Page 45: ...Flow Rate Tables Calibration Procedure 45 ...
Page 48: ...DP400A and DP600A Parts booklet 2002 seeding line ...
Page 52: ...2002 DP600A markers ...
Page 54: ...Marker Circuit Diagram ...
Page 55: ...W Seed box hopper extension ...
Page 56: ...W Seed box Peg Wheels ...
Page 57: ...W Seed box Distributor Assembly ...
Page 58: ...W Seed box Distributor Assembly ...
Page 59: ...W Seed box Variator Assembly W Seed box Variator Assembly ...
Page 60: ...W Seed box half width shut off ...
Page 61: ...W Seed box Venturi System ...
Page 62: ...W Seed box Drive Wheel Assy ...
Page 63: ...W Seed box Wind turbine Assy ...
Page 64: ...W Seed box Air Intake ...
Page 65: ...W Seed box RDS system ...