Practical Recommendations
C : Pre – Emergence Marking
•
Pre – Emergence discs operate simultaneously with post – emergence marking out. (Tramlines)
•
The marking out track must match that of the disengaged rows
•
Ground marking is adjusted by letting the discs “catch” more or less soil.
It is recommended to let the disc “catch in the edge of the first seeded row, so as to project soil
37
Summary of Contents for Tandem Uni-Drill DP400A
Page 9: ...Safety Regulations Safety Stickers 9 ...
Page 17: ...Start Up G TURBINE 17 ...
Page 23: ...Settings A Distribution Settings 23 ...
Page 32: ...Settings H Tramline Track Width 32 ...
Page 41: ...Flow Rate Tables Calibration Procedure 41 ...
Page 42: ...Flow Rate Tables Calibration Procedure 42 ...
Page 43: ...Flow Rate Tables Calibration Procedure 43 ...
Page 44: ...Flow Rate Tables Calibration Procedure 44 ...
Page 45: ...Flow Rate Tables Calibration Procedure 45 ...
Page 48: ...DP400A and DP600A Parts booklet 2002 seeding line ...
Page 52: ...2002 DP600A markers ...
Page 54: ...Marker Circuit Diagram ...
Page 55: ...W Seed box hopper extension ...
Page 56: ...W Seed box Peg Wheels ...
Page 57: ...W Seed box Distributor Assembly ...
Page 58: ...W Seed box Distributor Assembly ...
Page 59: ...W Seed box Variator Assembly W Seed box Variator Assembly ...
Page 60: ...W Seed box half width shut off ...
Page 61: ...W Seed box Venturi System ...
Page 62: ...W Seed box Drive Wheel Assy ...
Page 63: ...W Seed box Wind turbine Assy ...
Page 64: ...W Seed box Air Intake ...
Page 65: ...W Seed box RDS system ...