MAINTENANCE
Section
4
1.
Before all maintenance, service or repairs and when trying to identify a breakdown
or malfunction you must ensure that the power drive is disconnected and that the
engine is switched off and the ignition key removed.
2.
Check Tightness of screws and nuts. Retighten if necessary. (Especially Transport
Wheels).
3.
Before maintaining a machine in the raised position, support it by appropriate means.
4.
Before replacing a working part, wear protective gloves and only use the appropriate
tools.
5.
To protect the environment, it is forbidden to throw or pour out oils, grease and
filters of any description. They should be given to firms specialising in their
disposal.
6.
Before undertaking any electrical work on the tractor or attached machine disconnect
the alternator cable and the battery.
.
7.
Protective covers which are prone to wear should be checked regularly. Replace
immediately if damaged.
8
.
Spare parts must conform to the manufactures specification. Only use genuine
Moore
parts.
9.
Before working on any electrical circuit disconnect the power source.
10.
Repairs carried out on parts under tension or pressure (springs or components under
pressure etc) require specialist knowledge and tooling so should only be carried out
by
qualified
personnel.
11.
In the winter time leave the base flap fully open so any rodents can escape otherwise
they will chew through a peg wheel to get out.
12.
Do not leave any seed in the machine after the drilling season is finished
36
Summary of Contents for UNIDRILL 300
Page 1: ...August 2001...
Page 5: ...4 Safety Regulations...
Page 7: ...6 Warning Symbols 1...
Page 9: ...Safety Instruction Decals 8...
Page 10: ...Safety Instruction Decals 9 25...
Page 29: ...28...
Page 41: ...Maintenance Tyre pressure chart for 10 0 75 15 3 Vredestein Tyres 40...
Page 42: ...Optional Equipment Section 5 MS Flow Modulation 41...
Page 44: ...Starting up 43...
Page 45: ...Starting up 44...
Page 46: ...Operation 45...
Page 47: ...Operation 46...
Page 48: ...Operation 47...
Page 49: ...Operation 48...
Page 50: ...Operation 49...
Page 51: ...50 D E...
Page 55: ...Dragarm Seeding Unit 47 48 54 Parts list...
Page 59: ...Drawbar and Rear Axle Assembly 58 Parts list 47 48 45 1 2 49 3 4 50 51 52 53 53 A B 55 54 35...
Page 61: ...Drive wheel Assembly 60 Parts list 26...
Page 63: ...Seed Box Assembly S900520 S901537 62 Parts list...
Page 65: ...Seed Box Drive Unit 64 Parts list...
Page 67: ...Multiplicator Parts list 66...
Page 69: ...MS Flow Modulation Parts list 1 3 2 7 10 8 9 11 6 5 4 15 14 12 13 68...
Page 71: ...Linak Actuator Tramline Mechanism Parts list 1 5 2 7 6 4 3 9 8 70...
Page 73: ...Seedbox Metering Parts Parts list 10 12 11 8 6 5 4 3 9 2 1 7 72...
Page 75: ...SPI Vertical Lift Marker 74 Parts list...
Page 77: ...Moore Vertical Lift Marker 17 13 16 47 48 Complete disc hub assembly 14 15 74 Parts list...
Page 79: ...Electric Parts Sensors Parts list 1 4 3 2 76...
Page 86: ...Calibration Charts Calibration charts for Rape Barley Peas and Field Beans 83...
Page 87: ...Calibration Charts Calibration charts for Oats Mustard Phacelia and Radish 84...
Page 88: ...Calibration Charts Calibration charts for Lucern Linseed Rye grass and Clover 85...
Page 89: ...Notes 86...