36
MB 200
rev.0.1UL ID1460
6.5 POSITIONING AND WORKSPACES
The binder must be positioned so as to have a free space around of at least 80 cm and the working
area at least 120 cm.
The room where the machine is installed must be properly ventilated and air exchange according to
current legislation.
Work areas
Glue loading area
Glue and cleaner loading area. The operator has access to this
area to load the glue and / or cleaner onto the machine.
Access area for the service to access the electrical and pneumatic
panel.
Passing area
Transit area from the work area to the glue loading area.
Operator Work Zone
Operator's work area during normal use of the machine.
Left side of the machine
It is not necessary to leave a useful space.
800
500
1200
800
3050
2850
Zona di carico colla e cleaner
Loading zone glue ad cleaner
Zona di passaggio Transition area
Zona di lavoro
Working area
5500 NE Moore Court
Hillsboro, OR 97124
Toll Free: 1-800-944-4573
Local: 503-640-5920