175
ʚʍʐʴ̬૰ȟ॒ᛵȽȻȠ
WHEN BATTERY REPLACEMENT REQUESTED
4
ʚʍʐʴ̬૰ȟ॒ᛵȽȻȠ
WHEN BATTERY REPLACEMENT REQUESTED
ʚʍʐʴ̬૰ᛵʫʍʅ˂ʂɗʚʍʐʴ٢Ͳ˩ɬʳ˂ʪȟ
᚜ᇉȨɟȲȻȠɂǾ
NC
ʫʬʴʚʍɹɬʍʡႊʚʍʐʴȝɛɆ
ɿ˂ʦፏߦͱᏚ೫ҋႊʚʍʐʴɥ̬૰ȪȹȢȳȨȗǿɬʳ˂
ʪȟ᚜ᇉȨɟȹɕʚʍʐʴɥ̬૰ȮȭȾൡಽɥΈႊȪፖȤɞ
ȻǾʫʬʴюɁʑ˂ʉɗɿ˂ʦʬ˂ʉɁͱᏚʑ˂ʉȟțɞ
Բ᪙ॴȟȕɝɑȬǿ
When the screen displays the message requesting battery
replacement or any of the battery low voltage alarms, change
the NC memory back-up battery and the servo absolute
position sensing battery. Continued usage of the machine
without replacement of the batteries while the alarms are
displayed may cause the memory data and servo motor
position data to be lost.
4-1
ʚʍʐʴ̬૰ᛵʫʍʅ˂ʂ
Message Requesting Battery Replacement
7
า
7
CAUTION
ʚʍʐʴ̬૰ᛵʫʍʅ˂ʂȟ᚜ᇉȨɟȲȻȠɂǾ
NC
ʫʬʴ
ʚʍɹɬʍʡႊʚʍʐʴȝɛɆɿ˂ʦፏߦͱᏚ೫ҋႊʚʍʐ
ʴɥ̬૰ȪȹȢȳȨȗǿʚʍʐʴɥ̬૰ȮȭȾൡಽɥΈႊȪ
ፖȤɞȻǾʚʍʐʴ٢Ͳ˩ɬʳ˂ʪȟᄉႆȪɑȬǿɬʳ˂
ʪᄉႆऻȾʚʍʐʴɥ̬૰ȬɞȻǾȗȶȲɦໃɥȪɖȪ
ȹɬʳ˂ʪɥᜓȪɑȬɁȺǾʫʬʴюɁʑ˂ʉȟțɞԲ
᪙ॴȟȕɝɑȬǿ
If the screen displays the message requesting battery
replacement, change the NC memory back-up battery and
the servo absolute position sensing battery. Continued
usage of the machine without replacement of the batteries
while the alarms are displayed causes the battery low
voltage alarms to occur. Replacing the batteries after the
alarms are activated shuts off the power and deactivates
the alarm and may cause the memory data to be lost.
ᴹʚʍʐʴ̬૰ᛵʫʍʅ˂ʂᴻ
<Message requesting battery replacement>
‘
ްఙཟ೫
1’
႕ᬂɁ
‘
ʚʍʐʴ̬૰
’
ᬱᄻȺǾጮሥᩖȟཟ೫
ᩖȾҢᤎȬɞȻǾʚʍʐʴ̬૰ᛵʫʍʅ˂ʂȟ႕ᬂȾ᚜
ᇉȨɟɑȬǿȦɁʫʍʅ˂ʂȟ᚜ᇉȨɟȲɜʚʍʐʴɥ̬૰
ȪǾ
Ȍᆬᝓȍ
ɥઃȪȹȢȳȨȗǿ
As the accumulate time reaches the inspection time on
‘BATTERY REPLACEMENT’ in the ‘PERIODICAL
INSPECTION 1’ screen, the message requesting battery
replacement is displayed. Change the batteries when this
message is displayed then press
[CONFIRM]
.
2
าᜤ
2
NOTE
Ȍᆬᝓȍ
ɥઃȬȻǾ
‘
ްఙཟ೫
1’
႕ᬂɁ
‘
ጮሥᩖᴥᩖᴦ
’
Ɂඊȟ
0
ȾȽɝǾ
‘
ఊጶཟ೫ஓ
’
ɁඊȾஓ͇ȟоɝɑȬǿ
Pressing
[CONFIRM]
sets the ‘ACCUMULATE TIME’ to “0” and dates
on the ‘LAST INSPEC DATE’ in the ‘PERIODICAL INSPECTION 1’
screen.
1
ʚʍʐʴɁ̬૰ਖ਼ᬲɂǾ
1
“Replacing Batteries” (page 157) for the battery replacing proce-
dure.
Summary of Contents for NL1500/500
Page 8: ......
Page 9: ...CONTENTS FOR SAFE MACHINE OPERATION REGULAR MAINTENANCE TROUBLESHOOTING INDEX...
Page 10: ......
Page 19: ...FOR SAFE MACHINE OPERATION...
Page 50: ......
Page 51: ...1 1 CHAPTER 1 CHAPTER 1 REGULAR MAINTENANCE...
Page 167: ...2 2 CHAPTER 2 CHAPTER 2 TROUBLESHOOTING...
Page 181: ...181 ZERO POINT RETURN COMMAND ALARM TRIGGERED X X Axis Z Z Axis Y Y Axis...
Page 232: ......
Page 240: ......
Page 242: ......