PREPARATION BEFORE STARTING MASS PRODUCTION E-5
Mass
Production
Check Items
Check
Column
1.
Are all NC functions such as single block functions used to check the
program turned off?
2.
Is dimensional variation checked?
3.
Are run-out on I.D. and O.D., and end face waviness measured?
4.
Is a target work time established on the basis of the machining time for one
workpiece?
5.
Is tool nose wear observed?
6.
Are the dimensions measured after the rough cutting process?
7.
Is the front door closed?