background image

MAINTENANCE

M

43

REV.0-06/10

05/09/05  M43GB

NOTE

By maintenance at care of the utilizer we intend all the 

operatios  concerning  the  verification  of  mechanical 

parts, electrical parts and of the fluids subject to use or 

consumption during the normal operation of the machine.
For what concerns the fluids we must consider as main-

tenance  even  the  periodical  change  and  or  the  refills 

eventually necessary.
Maintenance operations also include machine cleaning 

operations when carried out on a periodic basis outside 

of the normal work cycle.
The repairs 

cannot be considered

 among the mainte-

nance activities, i.e. the replacement of parts subject to 

occasional damages and the replacement of electric and 

mechanic components consumed in normal use, by the 

Assistance Authorized Center as well as by manufacturer.
The replacement of tires (for machines equipped with 

trolleys) must be considered as repair since it is not de-

livered as standard equipment any lifting system.
The periodic maintenance should be performed accor-

ding to the schedule shown in the engine manual. An 

optional  hour  counter  (M)  is  available  to  simplify  the 

determination of the working hours.

ENGINE and ALTERNATOR

PLEASE  REFER  TO  THE  SPECIFIC  MANUALS 

PROVIDED.

Every  engine  and  alternator  manufacturer  has 

maintenance  intervals  and  specific  checks  for  each 

model: it is necessary to consult the specific engine or 

alternator USER AND MAINTENANCE manual.

VENTILATION

Make certain there are no obstructions (rags, leaves or 

other) in the air inlet and outlet openings on the machine, 

alternator and motor.

ELECTRICAL PANELS

Check condition of cables and connections daily.

Clean periodically using a vacuum cleaner, 

DO NOT USE 

COMPRESSED AIR.

DECALS AND LABELS

All warning and decals should be checked once a year 

and 

replaced

 if missing or unreadable.

STRENUOUS OPERATING CONDITIONS

Under  extreme  operating  conditions  (frequent  stops 

and  starts,  dusty  environment,  cold  weather,extended  

periods of no load operation, fuel with over  0.5% sulphur 

content) do maintenance more frequently.

BATTERY WITHOUT MAINTENANCE

DO NOT  OPEN THE BATTERY

The  battery  is  charged  automatically  from  the  battery 

charger circuit suppplied with the engine.

Check  the  state  of  the  battery  from  the  colour  of  the 

warning light which is in the upper part.

- Green colour: battery OK

- Black colour: battery to be recharged

- White colour: battery to be replaced

NOTE

THE ENGINE  PROTECTION NOT WORK WHEN THE 
OIL IS OF LOW QUALITY BECAUSE NOT CHARGED 
REGULARLY AT INTERVALS AS PRESCRIBED IN THE 
OWNER’S ENGINE MANUAL.

IMPORTANT

In the maintenance operations avoid that 

polluting  substances,  liquids,  exhausted 

oils, etc. bring damage to people or things or 

can cause negative effects to surroindings, 

health or safety respecting completely the 

laws  and/or  dispositions  in  force  in  the 

place.

!

!

WARNING

 

Have 

qualified

 personnel do maintenance and troubleshooting work.

 

Stop the engine before doing any work inside the machine. If for any 

reason the machine must be operated while working inside, 

pay at-

tention

 moving parts, hot parts (exhaust manifold and muffler, etc.) 

electrical parts  which may be unprotected when the machine is open.

 

Remove guards only when necessary to perform maintenance, and 
replace them when the maintenance requiring their removal is complete.

 

Use suitable tools and clothes.

 

Do not modify the components if not authorized.

  - See pag. M1.1 -

MOVING

PARTS

can injure

HOT surface

can

hurt you

!

Summary of Contents for GE 20 YSX

Page 1: ...USE AND MAINTENANCE MANUAL MOSA 25 09 12 84920M00 preparato da UPT approvato da DITE GE 20 YSX 849209003 GB 0 3 1 3...

Page 2: ...des a tank an engine alternator unit fixed on the base by elastic dampers a roll bar with hook for an easy and sure lifting a chest hinged to the roll bar for a quick access to the engine and to the a...

Page 3: ...continue to satisfy the needs of its clients aswell as to improve the transparency and thecom munications regarding all the company s activesin accordance with the official procedures and inhar mony w...

Page 4: ...INSTALLATION M 2 7 INSTALLATION AND DIMENSIONS M 3 UNPACKING M 4 2 TRANSPORT AND HANDLING M 6 20 CTL 20 ASSEMBLY M 20 SET UP FOR OPERATION M 21 START AND STOP M 31 CONTROLS M 32 CONTROLS M 39 12 EP6...

Page 5: ...matter In no case MOSA division of B C S S p A will be held responsible for any damaga direct or indirect in relation with the use of the given information MOSA division of B C S S p A does not take...

Page 6: ...mpness and heat You must take into account that some figures contained in it want only to identify the described parts and therefore might not correspond to the machine in your possession INFORMATION...

Page 7: ...elf the list of these directives is part of the declaration of conformity included in any machine standard equipment Here below the adopted symbol CE marking is clearly readable and unerasable and it...

Page 8: ...mber ______________________________ conforme con quanto previsto dalle Direttive Comunitarie e relative modifiche est en conformit avec ce qui est pr vu par les Directives Communautaires et relatives...

Page 9: ...wer PRP maximum available power for use at variable loads for a yearly illimited number of hours The average power to be taken during a period of 24 h must not be over 80 of the PRP It s admitted over...

Page 10: ...persons or things Do not use without protective devices provided Removing or disabling protective devices on the machine is prohibited Do not use the machine if it is not in good technical condition...

Page 11: ...ersons Use only with safety clothing It is compulsory to use the personal protection means given in equip ment Use only with safety clothing It is compulsory to use the personal protection means given...

Page 12: ...tely Wipe up spilled fuel before starting engine An electric shock can kill Shut off fuel of tank when moving machine where it is assembled Avoid spilling fuel on hot engine Sparks may cause the explo...

Page 13: ...s are equipped with a control system that is NOT influenced by standard environmental fac tors and is able to stop the unit in case of anomalous values in the fundamental parameters In order to avoid...

Page 14: ...nce no specific mea sures are needed in this regard In case of doubts concerning your genset do not hesitate to contact our technical sales office Installation instructions M 2 6 1 REV 0 06 10 ATTENTI...

Page 15: ...fix the genset to it by using screw anchors or rag bolts Base dimensions should exceed genset dimensions of at least 200 mm on each side Base should weigh three times static genset weight indicated on...

Page 16: ...duct should be evaluated If the duct is not appropriately insulated room temperature may in crease considerably for this reason it may be necessary to install an electro ventilator for correct air ex...

Page 17: ...Installazione Installation Installation Luftzirkulation Instalaci n GE 20 YSX M 2 7 REV 0 09 12 27 09 12 84920 I...

Page 18: ...Dimensioni Dimensions Dimensions Abmessungen Dimensiones GE 20 YSX M 2 7 1 REV 0 09 12 27 09 12 84920 I...

Page 19: ...rough handling or taking away of parts contained inside the packing or in the set In case you find damages rough handling or absence of parts envelopes manuals etc we advise you to inform immediately...

Page 20: ...ide the panel and to the instruments on the front To access the hook points on the top of the unit use approved ladders only or support from another opera tor climb the ladder using non skid shoes ATT...

Page 21: ...nnected to the generating set baseframe it can not be towed on public roads Therefore it can only be used on private roads and no through traffic zones The maximum speed allowed is 40 km h on smooth s...

Page 22: ...the machine to the ground and place the parking foot definitively regulating at the suitable height ATTENTION Do not substitute the original tires with other types 7 8 9 Nota Lift the machine and asse...

Page 23: ...he state of the battery from the colour of the warning light which is in the upper part Green colour battery OK Black colour battery to be recharged White colour battery to be replaced DO NOT OPEN THE...

Page 24: ...t an easy job A lack in tacking these precautions would result in the mix of different additives used in different coolants which would originate gelatinous substances capable of obstructing the cooli...

Page 25: ...ng and on the display the word fail appears Turning the key on OFF the EP6 is reset and a new starting cycle can be fixed Stop it is COMPULSORY to disconnect the load first then to stop the engine tur...

Page 26: ...ing light PTO HI B5 Auxiliary current push button C2 Fuel level light C3 E A S PCB C6 Control unit for generating sets QEA D Ground fault interrupter 30 mA D1 Engine control unit and economiser EP1 D2...

Page 27: ...Comandi Controls Commandes Mandos GE 20 YSX M 31...

Page 28: ...ol tage operation messages 15 A C socket AUX sockets for load connection I6 Start Local Remote selector Selection of engine control in use Local start control on board EP6 operated Remote start extern...

Page 29: ...0 In case of an Automatic Periodic Test A P T the display will show the message tESt 2 2 MANUAL operating mode To start the engine follow the instructions A Turn ON the KEY SWITCH the EP6 illuminates...

Page 30: ...matically anytime the key switch is turned ON The LEDs and DISPLAY light up for about 1 second 6 0 Parameters and settings The unit is programmed by the supplier of the Gen erating Set Contact the Gen...

Page 31: ...ing for at least 2 seconds the EP6 will energize the over voltage protection Hi U see section 4 0 to stop the engine The inh code inhibits the over voltage P 8 Generator Under Frequency Inh inh 1 to 9...

Page 32: ...P 24 P 24 Crank OFF Inh Crank Termination setting 100 800 rpm If the speed rises above the setting the EP6 terminates the crank cycle One sec onddelay avoids false termination The code Inh inhibits t...

Page 33: ...rror accumulation and in case your unit is programmed to allowAutomatic Periodic Test we recommend the following procedures disconnect the power supply of the EP6 consult your genset supplier wait for...

Page 34: ...ions and nominal values for voltage frequency power factors cos There are various types of power PRIME POWER PRP STAND BY POWER established by ISO 8528 1 and 3046 1 Norms and their definitions are lis...

Page 35: ...e motor allows it see to a start up with reduced voltage star point triangle start up or with autotransformer or use a soft start system In all cases when the user circuit requires the start up of an...

Page 36: ...tection forcefully pressed to prevent its intervention ATTENTION USAGE WITH EAS AUTOMATIC START UP PANEL The electricity generating group in combination with the EAS automatic start up panel forms a u...

Page 37: ...ng NOTE LEGEND A3 1 Adjustment potentiometer insulation resi stance A3 2 Manual reset push button A3 3 Test push button A3 4 Auxiliary fedding presence LED A3 5 TRIP LED A3 2 A3 3 A3 1 A3 5 A3 4 RESET...

Page 38: ...e front plate X1 and or rear plate with a multiple connector N B The remote control TCM 35 can be used only with machines equipped with control and protection device EP6 U7 For use of TCM 35 see page...

Page 39: ...ernal tank at the same level of the generator the minimum diameter of the connecting hoses must be 15 mm the maximum length of the connecting hoses must be 5m A pressure sensor on the return pipe of t...

Page 40: ...s and connections daily Clean periodically using a vacuum cleaner DO NOT USE COMPRESSED AIR DECALS AND LABELS All warning and decals should be checked once a year and replaced if missing or unreadable...

Page 41: ...year even if the requested number of hours has not been attained EVERY WEEK EVERY MONTH AND OR AFTER INTERVENTION ON LOAD EVERY YEAR 1 TEST orAUTOMATIC TEST cycle to keep the generating set constantl...

Page 42: ...e Department Black smoke 1 Air filter clogged 2 Overload 3 Injectors defective Injection pump requires calibration 1 Clean or replace 2 Check the load connected and diminish 3 Ask for intervention of...

Page 43: ...motor running speed 2 Voltage regulating device where it is assembled defective or requires calibration 3 Alternator defective 1 Regulate speed to its nominal no load value 2 Adjust regulator device...

Page 44: ...he covers and all the other parts of the machine carefully Protect the machine with a plastic hood and store it in o dry place DIESEL ENGINE For short periods of time it is advisable about every 10 da...

Page 45: ...f the various components of the machine must be made accordingly to rules in force of law a o local rules Particular attention must be paid when getting rid of lubricating oils battery electrolyte and...

Page 46: ...filter clogging T4 Warning light air filter clogging U4 Polarity inverter remote control V4 Polarity inverter switch Z4 Transformer 230 48V W4 Diode bridge polarity change X4 Base current diode bridge...

Page 47: ...GE 15 YSX GE 20 YSX M 61 REV 0 09 12 Schema elettrico Electric diagram Schemas electriques Stromlaufplan Esquema el ctrico 27 09 12 84910 I...

Page 48: ...o di n Pag n 4 Date Appr Approved Project Denomination Machine Modification Date Da Pag Alla Pag To Page From Page Designer of n Desi Dis n Exp Page n Dwg n Disegnatore 5 5 4 3 27 26 3 4 26 27 3 27 4...

Page 49: ...GE 20 YSX M 61 3 REV 0 09 12 Schema elettrico Electric diagram Schemas electriques I GB F D E NL Stromlaufplan Esquema el ctrico 27 09 12 84920 I...

Page 50: ......