98~
2.Testing the recharging performance
a. This test needs to be done after
engine is warm- up.
And take off the luggage case
Firstly.
b. Disconnect the orange cable of
regulator.
c. Open the fuse box to remove the
white cable
d. Connect currency meter between red/
white cable fuse.
d. Set the headlamp switch at “OFF” , engine rotation is at 2000 rpm while testing.
Then increase the rpm slowly.
Head Lamp Switch
Recharging rpm
2,500rpm
6,000rpm
OFF (DAY)
Under2,000upm
0.6A(MIN)
1.5A(MIN)
ON (NIGHT)
Under2,000upm
0.6A(MIN)
1.5A(MIN)
e. If the testing result does not match standard value, check the regulator.
This test needs to be done under the
Battery has been recharged completely
While testing, the red wire cable must not touch the frame.
Summary of Contents for PA125
Page 10: ... 10 B CHASSIS Steel ball steering Front brake fluid Front brake cam ...
Page 12: ......
Page 33: ...33 1 Lubrication System Lubrication System Diagram ...
Page 42: ...42 42 2 Engine dismantling A Dismantling engine B lnstalling engine ...
Page 63: ... 63 7 A C Generator A Dismantling AC generator B Installing AC generator ...
Page 92: ... 92 F Rear damper 1 Rear damper disassembling diagram ...
Page 99: ... 99 3 Recharge system 1 Recharge system diagram ...
Page 103: ... 103 5 Starting system 1 Starting wiring ...