BLE100 Installation and Operation Manual
Section 4
Bench Testing
Motorola’s recommended procedure for placing a new BLE100 into service is to fully test it on
the bench before it is field installed. There are specific alignment procedures that ensure proper
functioning of all components and simplify final installation. If the BLE100 is properly aligned
on the bench only minor adjustments may be required in the field.
The following subsections provide instructions to bench align the BLE100.
Before You Begin
The BLE100 is shipped with a 20 ampere blade-type fuse in the output port for over current
protection.
CAUTION!
To avoid applying 60/90 Vac to the test equipment during testing, remove the fuse illustrated in Figure 2-8.
Open the housing and remove the chassis cover. Refer to your system drawings or records to
confirm the presence of the required options as described in Section 2, “Overview,” Options and
Accessories.