1-2
Introduction
BLE100 Installation and Operation Manual
Figure 1-2 illustrates an open BLE100.
Figure 1-2
BLE100 – open
Base
Lid
SRE-X-XX
SFE-100-XX
L
IN
JXP
-20dB
ICS
JXP OUT
EQ
RTN
THERM
JXP
L
-20dB
FUSE VALUES
MANUAL FOR
REFER TO
DISCHARGE (ESD)
DAMAGE BY ELECTROSTATIC
ASSEMBLIES SUSCEPTIBLE TO
CAUTION: CONTAINS PARTS AND
-16dB
MONITOR
STATUS
H
OUT
REFER TO MANUAL
CHECK VOLTAGE
SELECTOR
-20dB
JXP
ADU
ADU
N
J
K
A
S
100
87
ADU
BODE
ASSEMBLED IN MEXICO
TEST
MONITOR
STATUS
FUSE
RCB100
BLE
H
POINT
FUSE
TDU
AUTO
ALIGN DOTS
JXP IN
IN
-20dB
EQ
FWD
MAN
JXP MID
LDR
AC
RC
+24V DC
TEST POINT
MAN