Issue 1.1 April 2006
Page 157
16.6 Lightning
Protection
16.7 Overview
Chapter 12 in the main body of this manual contains the requirements for the 150/300 Mbps
Backhaul deployment. This section details the additional requirements for the deployment of
E1/T1.
16.8 Recommended Additional Components for E1/T1 Installation
The recommended components below are in addition to those listed in section 10, the extra
components required for the E1/T1 installation are:
•
Screened (Shielded) Cat 5 Cable
•
Surge Arrestor Units — Transtector type ALPU-ORT, 4 required per link.
•
RJ45 screened connectors
•
10 AWG Grounding Cable
For a description of Zone A and Zone B refer to section 10.
Zone A
Zone B
Ground (Earth) ODU
Mandatory
Mandatory
Screen Cable
Mandatory
Mandatory
Surge Arrestor Unit ALPU-ORT at ODU
Mandatory
Mandatory
Ground (Earth) Cable at Building Entry
Mandatory
Mandatory
Surge Arrestor Unit ALPU-ORT at
Building Entry
Mandatory Mandatory
Table 19: Protection Requirements
Summary of Contents for Canopy 150 Mbps Backhaul
Page 1: ...Canopy 150 300 Mbps Backhaul User Guide BH150 300 UG en Issue 1 1 April 2006 ...
Page 25: ...Issue 1 1 April 2006 Page 24 Figure 5 Canopy 150 300 PIDU Power Input ...
Page 97: ...Issue 1 1 April 2006 Page 96 Figure 59 Spectrum Management Help Page ...
Page 162: ...Issue 1 1 April 2006 Page 161 Figure A8 Surge Arrestor ALPU ORT Connection Illustration ...