Issue 1.1 April 2006
Page 36
7 Installation
Motorola recommends that only qualified personnel undertake the installation of a Canopy
150/300 Mb BH system.
7.1 Preparation
Before proceeding with the installation you should:
•
Check the contents of all packages against the parts lists shown in the packing list.
•
Ensure that you have the correct tools for the job.
•
Ensure that you are qualified to undertake the work.
•
Ensure that you have taken the correct safety precautions.
•
Have completed the site planning as described in section 6 “Site Planning”.
7.2 Installation
Procedure
The Canopy 150/300 Mb BH installation procedure consists of the following steps:
•
Mounting the ODUs, section 7.6
•
Connecting up, section 7.7.
•
Mounting the 150/300 Mbps Backhaul PIDUs, section 7.7.8
•
Powering
Up,
section
7.7.10
•
Aligning the ODUs, section 7.7.11.
7.3
Tools Required
The following specific tools are required to install the Canopy 150/300 Mb BH in addition to
general tools:
•
Two 13mm Spanners / Wrenches
•
RJ45 Crimp Tool
•
IBM Compatible Personal Computer (PC) running Windows 98 or later with 10 or
100baseT Ethernet (Ability to change IP settings easily is recommended)
•
Either Internet Explorer version 6 or higher, or FireFox 1.0 or higher are recommended.
•
2 x short Ethernet patch cables
•
6mm general purpose crimp tool for the grounding lug (optional for lightning Protection)
7.4 Installation
Support
Online installation support can be found at
A Frequently Asked Questions (FAQ) section can be found in section 14.8.
7.5
Legal Disclaimer
IN NO EVENT SHALL MOTOROLA BE LIABLE FOR ANY INJURY TO ANY PERSONS OR
ANY DAMAGE CAUSED DURING THE INSTALLATION OF THE MOTOROLA Canopy
150/300 Mbps Backhaul PRODUCT.
Summary of Contents for Canopy 150 Mbps Backhaul
Page 1: ...Canopy 150 300 Mbps Backhaul User Guide BH150 300 UG en Issue 1 1 April 2006 ...
Page 25: ...Issue 1 1 April 2006 Page 24 Figure 5 Canopy 150 300 PIDU Power Input ...
Page 97: ...Issue 1 1 April 2006 Page 96 Figure 59 Spectrum Management Help Page ...
Page 162: ...Issue 1 1 April 2006 Page 161 Figure A8 Surge Arrestor ALPU ORT Connection Illustration ...