Preparing for installation
Chapter 5 Installation
phn-2182_002v000
5-2
May 2011
Preparing for installation
This section describes the checks to be performed before proceeding with site
hardware installation.
Use the installation report to determine which installation options are required. Refer
to
PTP LINKPlanner
on page
2-8
.
Unit pre-configuration
It is common practice to pre-configure the units during staging before site installation
by performing the following tasks from
Chapter 6 Configuration and alignment
:
x
Connecting to the unit
on page
6-3
x
Upgrading firmware version
on page
6-10
x
Using the installation wizard
on page
6-14
If the units are to be pre-configured during staging, the safety precautions below
MUST be observed.
Safety precautions
All national and local safety standards must be followed while developing a site,
installing equipment, or performing maintenance.
WARNING
Ensure that personnel are not exposed to unsafe levels of RF energy.
The units start to radiate as soon as they are powered up. Respect the
safety standards defined in
Compliance with safety standards
on
page
4-22
, in particular the minimum separation distances. Observe
the following guidelines:
o
Never work in front of the antenna when the ODU is powered.
o
Always power down the PoE power supply when connecting and
disconnecting the drop cable from either the PoE power supply or ODU.
Summary of Contents for Motorola PTP 250
Page 20: ...List of Tables phn 2182_002v000 xiv May 2011 ...
Page 30: ......
Page 80: ...Data network planning Chapter 2 Planning considerations phn 2182_002v000 2 22 May 2011 ...
Page 126: ...Notifications Chapter 4 Reference information phn 2182_002v000 4 36 May 2011 ...
Page 234: ...Testing the radio link Chapter 8 Troubleshooting phn 2182_002v000 8 14 May 2011 ...