Test link end hardware
Chapter 8 Troubleshooting
phn-0896_012v000
8-2
Jul 2010
Test link end hardware
Before testing link end hardware, confirm that all outdoor drop cables, that is those
that connect the ODU or GPS receiver (if installed) to equipment inside the building,
are of the supported type, as defined in
Cable and connector specifications
on page
4-
16
.
If the Power and Ethernet LEDs do not illuminate correctly during the start-up
sequence, test the link end as described in the flowchart (
Figure 8-1
) and detailed test
procedures that follow.
If a UltraSync GPS synchronization unit has been installed, but one or more of its
status LEDs are not illuminated, refer to
Test UltraSync GPS receiver
on page
8-15
.
4Gon www.4Gon.co.uk info@4gon.co.uk Tel: +44 (0)1245 808195 Fax: +44 (0)1245 808299