50
the heater and begin the reflow cycle. Heating time should not be less
than two minutes.
Once the RF PA reflows, raise the heat-focus head and wait
approximately two minute for the part to cool. Remove the circuit
board and inspect the solder joint between the slab and the ground
plane. No cleaning should be necessary. Use the soldering iron and add
solder to each of the RF PA leads and associated pads. Inspect the lead/
pad bond for opens and solder shorts.
Summary of Contents for SYMBOL MT2000 Series
Page 1: ...HT 1000 JT 1000 MT 2000 MTS 2000 and MTX Series Handie Talkie Portable Radios Service Manual ...
Page 2: ......
Page 24: ...2 Notes ...
Page 78: ...56 Notes ...
Page 147: ...Appendix A 9 Appendix Figure 2 Secure Module Location Detail ...
Page 169: ......