Maintenance
- 13 -
BELT INSTALLATION AND TENSIONING
INSTALLATION
Adjust the sprockets using a straight edge. Slide up the edge on the larger pulley until it contacts the
smaller pulley. Properly adjusted pulleys will provide three points of contact. Properly aligned pulleys
will provide four points of contact. Tighten setscrews and recheck alignment.
TENSIONING
Check the force F required to provide a deflection of 1/8 in. If the measured force is less than 15 lbs
then lengthen centre distance C.
Summary of Contents for E-242HD
Page 4: ...Instructions 4 INSTRUCTIONS...
Page 7: ...Maintenance 7 MAINTENANCE...
Page 21: ...Curtis Speed Controller 21 CURTIS SPEED CONTROLLER...
Page 29: ...Curtis Speed Controller 29 CURTIS PMC MOTOR CONTROLLER...
Page 35: ...Spare Parts 35 SPARE PARTS...
Page 37: ...Spare Parts 37 DIFFERENTIAL...
Page 47: ...Spare Parts 47 ACCESSORIES NO DC DC CONVERTER ACCESSOIRES SANS CONVERTISSEUR DC DC...
Page 49: ...Spare Parts 49 BATTERY CONFIGURATIONS 24V CONFIGURATIONS DES BATTERIES 24V...
Page 55: ...Spare Parts 55...
Page 56: ...Spare Parts 56...