MP-T400-DV Wall Mount INSTALLATION INSTRUCTION
Step 3:
Install the bracket rail onto the back of
the TV.Screw two bolts into the holes
in the back of the panel TV to install
each monitor bracket. Make sure the
distance from each bracket to the top of
the panel TV is equal, and also as center
as possible. The parts shall be selected
according to the dimensions of the holes
in the back of the panel TV.
Step 4:
Enlarged view 1: hang the two
monitor brackets on the wall plate,
relax the hands until they are caught
hold of.
Enlarged view 2: Fix the two bolts
under the monitor brackets inside of
the wall plate and then screw them
down.
E
C/D
F/G
Step 5:
Adjust the angle of the panel TV
between -10 and 0 degrees to a
suitable position, and screw the knobs
up at last.
-10°
1. Technical Parameter
Max VESA: 400×400; Maximum load: 66lbs.
2. Parts List
Please check the parts in the package in comparison with the following list,make sure all of
the parts are in the package. Never use defective parts, never replace part with different specification.
Step 1:
Use the wall plate as a template to
drill four holes of dia.10mm and
50mm depth in the wall.Then
wedge four plastic anchors
anchors into the holes.
Step 2:
Install the wall plate. Put the wall
plate on the wall, and then screw
four self-tap screws into each plastic
anchor through metal washer to fix
the wall plate onto the wall.
(E) 15mm Plastic Sleeve (4) (F) M6x30 screws(4)
(G) M8x30 screws(4)
3. Installation and operation instructions
Note: please read the instructions carefully before installation!
B
(A) M8x50 Self-tap Screw (4) (B) 10x50 Plastic Anchor (4)
(H) Bubble level
B
A
C
WALL
WALL
TV
TV
TV
WALL
(C)
Φ8x22 Flat washer (8)
(D)
Φ6x16 Flat washer (4)
STEP-1
STEP-2
STEP-5
STEP-4
STEP-3
Enlarged view 1
Enlarged view 2
bolts