background image

 MP-T400-DV Wall Mount  INSTALLATION INSTRUCTION

Step 3:
Install the bracket rail onto the back of
the TV.Screw two bolts into the holes
in the back of the panel TV to install
each monitor bracket. Make sure the 
distance from each bracket to the top of 
the panel TV is equal, and also as center 
as possible. The parts shall be selected 
according to the dimensions of the holes 
in the back of the panel TV.

Step 4:
Enlarged view 1: hang the two
monitor brackets on the wall plate,
relax the hands until they are caught
hold of.
Enlarged view 2: Fix the two bolts
under the monitor brackets inside of
the wall plate and then screw them
down.

E

C/D

F/G

Step 5:
Adjust the angle of the panel TV
between -10 and 0 degrees to a 
suitable position, and screw the knobs 
up at last.

-10°

1. Technical Parameter

Max VESA: 400×400; Maximum load: 66lbs.

2. Parts List

Please check the parts in the package in comparison with the following list,make sure all of 

the parts are in the package. Never use defective parts, never replace part with different specification.

Step 1:
Use the wall plate as a template to
drill four holes of dia.10mm and 
50mm depth in the wall.Then 
wedge four plastic anchors 
anchors into the holes.

Step 2:
Install the wall plate. Put the wall
plate on the wall, and then screw 
four self-tap screws into each plastic 
anchor through metal washer to fix 
the wall plate onto the wall.

(E) 15mm Plastic Sleeve (4)  (F) M6x30 screws(4)

(G) M8x30 screws(4)

3. Installation and operation instructions

Note: please read the instructions carefully before installation!

B

(A) M8x50 Self-tap Screw (4) (B) 10x50 Plastic Anchor (4)

(H) Bubble level

B

A

C

WALL

WALL

TV

TV

TV

WALL

(C) 

Φ8x22 Flat washer (8)

(D) 

Φ6x16 Flat washer (4)

STEP-1

STEP-2

STEP-5

STEP-4

STEP-3

Enlarged view 1

Enlarged view 2

bolts

Reviews: