MTUX/IA-63-00 – Installation Manual
133
Date: 2017/02/17
00
17.4.1.2
Installation Advices
All installation advices are based on HIRD - SX - 0129x-01 (ITAS 832 SP),
please refer to the data sheet.
TX and RX is related to the respective device.
Standard ComPort on MT in Com3 on the MDR50 central connector.
Com Gnd 19 is to be connected to pin 26 -29 (MDR50)
On/Off Control activation pin (pin 6/grey in M12-8 ITAS) is to be connected
to pin 5 =
External Power Source: 8—32 VDC (5VDC optional¹)
Power Consumption: 1 Amp max transmit
65mA Standby
on/off signal line
Transient Protection: SAE J1113/11/12
Reverse Voltage Protection: 24V tested
Note: On/Off control through power-line results in a 30sec start-up
delay.
•
•
•
•
•
•
Summary of Contents for MT-VisionAir X ETSO
Page 10: ...MTUX IA 63 00 Installation Manual 10 Date 2017 02 17 INTENTIONALLY LEFT BLANK ...
Page 12: ...MTUX IA 63 00 Installation Manual 12 Date 2017 02 17 INTENTIONALLY LEFT BLANK ...
Page 28: ...MTUX IA 63 00 Installation Manual 28 Date 2017 02 17 INTENTIONALLY LEFT BLANK ...
Page 107: ...MTUX IA 63 00 Installation Manual 107 Date 2017 02 1700 12 4 Dimensions in mm ...
Page 112: ...MTUX IA 63 00 Installation Manual 112 Date 2017 02 17 13 3 Dimensions in mm ...
Page 125: ...MTUX IA 63 00 Installation Manual 125 Date 2017 02 1700 INTENTIONALLY LEFT BLANK ...
Page 137: ...MTUX IA 63 00 Installation Manual 137 Date 2017 02 1700 ...
Page 138: ...MTUX IA 63 00 Installation Manual 138 Date 2017 02 17 ...
Page 139: ...MTUX IA 63 00 Installation Manual 139 Date 2017 02 1700 INTENTIONALLY LEFT BLANK ...
Page 146: ...MTUX IA 63 00 Installation Manual 146 Date 2017 02 17 INTENTIONALLY LEFT BLANK ...