13
Equipment Operation Instructions
Before starting the machine, please confirm that the equipment power
plug is installed on the leakage protector equipped with the product (see the
'leakage protector' on the next page), and check whether the power supply
is normal, the equipment power indicator is on, indicating that the power
supply is normal.
Lock panel
Keep pressing the power button (
) on the control panel for three
seconds to lock the indicator light.Open panel lock mode, pressing any
control key on the equipment panel; continuously press power key (
) for
three seconds.
Start and close equipment
When the power supply is connected to the indicator light and turns on,
press the power button (
) to start the device.The equipment is automati-
cally set to high speed mode, running for 15 minutes, the ozone is turned on;
press the power button (
) again to close the power equipment.
Time adjustment Please adjust the time adjustment knob in the function-
al control area (
), You can adjust the time.
Time adjustment
Time setting is divided into: minutes, minutes, minutes, automatic
cycle mode.
Note: When the automatic circulation indicator lamp (
) is on, the equipment
will enter the automatic continuous operation mode.
Please adjust the air volume adjustment knob (
) in the functional
control area.
Air volume adjustment
Wind volume adjustment with wind volume and small wind volume to
provide user choice in cycle mode.
Touch the ozone button
(
)
,on the control panel to turn the ozone
function on or off.
Opening and closing ozone
(O
�
)