16
6.3.2. Power Harness Installation
Purge kit contains power cable, circuit breaker, twist lock plug, and all necessary
connectors.
1. Route supplied power harness and hardware into machine electrical panel.
•
Be sure to leave enough cable leading outside the machine for twist lock plug
to reach Purge electrical panel.
•
If ¾” conduit plug is not available, knock out hole and use supplied cord grip.
2. Following local electrical codes, install 3phase power to 208-230VAC line (480V
optional).
•
The Purge is phased Red, White, Black.
•
Wire power cable in parallel with machine tool power.
•
Be sure to leave enough cable to properly ground the unit.
3. Locate proper grounding point. Attach using supplied ring terminals.
4. Connect twist lock plug into receptable on bottom of Purge electrical panel.
*Warning, pump may auto start when Purge disconnect is turned on*
3 phase power installation should only be performed by qualified personnel.
Summary of Contents for PURGE Series
Page 15: ...10 4 3 Floor Layout ...
Page 44: ...39 10 Schematics and Diagrams 10 1 1 POWER SCHEMATIC 208 230V ...
Page 45: ...40 10 1 2 POWER SCHEMATIC 480V ...
Page 46: ...41 10 2 CONTROL SCHEMATIC ...
Page 47: ...42 10 3 FLOW DIAGRAM ...