background image

Select such battery types as SLD/FLD/GEL/USE, and select the appropriate system voltage.
As shown in Fig. 4-1, the charging stages of lead-acid battery are: MPPT charging, constant voltage charging (equalizing/
boost/floating charging), and current-limiting charging.The constant voltage charging is divided into three stages: 
equalizing charging, boost charging and floating charging:[MPPT charging] When the battery voltage has not reached the 
target constant voltage value, the controller will perform MPPT charging. When the battery voltage reaches the constant 
voltage value, it will automatically exit MPPT charging and switch to constant voltage charging (equalizing/boosting/
floating charging).
[Equalizing charging] Regular equalizing charging is good for some batteries. Equalizing charging is mainly to make the 
charging voltage of battery higher than the standard supplementary voltage, besides, it can vaporize the battery electrolyte 
to balance the battery voltage and complete relevant chemical reaction. Equalizing charging and boosting charging are 
not repeated during one full charging to avoid excessive gas evolution or overheating of the battery.
Notes:
1) Since the equalizing charging of floored lead-acid battery produces explosive gas, the battery compartment must be 
well ventilated.
2) Although the equalizing charging elevates the battery voltage, it may damage the level of sensitive DC loads, 
therefore, it is necessary to verify that the allowable input voltage of all loads in the system is greater than the set battery 
voltage value in equalizing charging.
3) Excessive charging and excessive gas evolution may damage the battery plate and cause the active substances on the 
battery plate to fall off.Besides, excessive high equalizing charging voltage or excessive long equalizing charging 
duration may damage the battery. Please set relevant parameters according to the specifications of the battery used in the 
system.
[Boost charging] The duration of boost charging is 2 h (default). When the duration reaches the set value, the system will 
switch to floating charging.

[Floating charging] Floating charging is the last constant voltage charging stage in the charging cycle of lead-acid battery. 
The controller keeps the charging voltage constant at the floating charging voltage. At this stage, the battery is charged 
with a very weak current to ensure that the battery is in full-charging. When the battery voltage is as low as the reconnect 
voltage of boost charging, the system will exit the floating charging stage and re-enter the next charging cycle.

07

08

Fig. 4-1 Charging curve of lead acid battery

Charging 
voltage

Time

Equalizing charging voltage

MPPT

Boost charging voltage

Floating charging voltage

Charging reconnect voltage

Constant voltage 

Floating 

Charging 
current

Time

Select such battery types as LI/USE LI, and select the system voltage from 12V/24V.
As shown in Fig. 4-2, the charging stages of lithium battery are: MPPT charging/boost charging/
current-limiting charging.
[MPPT charging] When the battery voltage does not reach the target constant voltage value, the controller 
conducts MPPT charging to charge the battery with maximum solar power, when reaches, it automatically 
switches to boost charging.
[Boost charging] In the boost charging stage of lithium battery, when the battery voltage is lower than 
the boost charging voltage, the system conducts MPPT charging or current-limiting charging, when 
reaches, it switches to boost charging.

Time

Time

Charging 
voltage

Fig. 4-2 Charging curve of lithium battery

Charging

Boost charging voltage

MPPT

Constant voltage charging

1) Connect the temperature sensor to the corresponding temperature interface to achieve the high and 
low temperature protection for the battery and the temperature compensation for the charging voltage 
of lead-acid battery (no temperature compensation for the lithium battery); if the temperature sensor is  
not connected, the default temperature is 25°C;

2). For the battery-related temperature protection/recovery value, please refer to the description in "12. 
System alarm". The wiring method is shown in the figure:

1) [Recovery strategy of load short-circuit protection]:

 Automatic recovery: the self recovery time of the first protection is 10s, the second is 15s, 

the third is 

20s, the fourth is 25s, the fifth is 30s, with more than five times restore the load output 

② Manual recovery: press and hold the "SELECT" button for 2s on the system alarm interface,  
and the

 load will be recovered and output;

2) [Overload protection strategy]: 10s protection for the load greater than 1.25 times the rated load; 5s 

protection for the load greater than 1.5 times the rated load; 1s protection for the load greater than 

2 times the rated load;

3) Please refer to "8.11-8.13" for load related settings.

4. Charging

4.1 Charging of lead-acid battery

4.2 Charging of lithium battery

5. Battery Temperature Sampling and Control

6. Load output

 current

charging

charging

the next day;

fu

s

e

s

te

m
p

e

ra

tu

re s
e

n

s

o

r

Summary of Contents for Shiner2410

Page 1: ...Version V1 01 MPPT Solar Charge Controller Subject to change without notice User Manual Code 106998 ...

Page 2: ...d tips to the operator Contents 01 02 03 03 04 04 04 1 Product introduction 1 1 Product overview 1 2 Product features 1 3 Description on appearance and interface 07 12 11 12 12 12 13 8 1 Battery parameter list 8 2 Parameter setting list 8 3 Type of battery 8 4 Equalizing charging boost charging floating charging charging reconnect voltage over 8 5 System voltage 8 6 Charge current 8 7 Full charging...

Page 3: ...attery voltage is about 12V therefore when the common charge controller is charging the battery the voltage of the solar battery is about 12V that is the solar battery does not fully exert its 1 2 Product features S N Name 1 LCD 2 Button 3 Solar panel positive interface 4 Solar panel negative interface 5 Battery negative interface 6 Load negative interface 7 S N Name Battery positive interface Loa...

Page 4: ...Static power consumption 10mA Battery Type SLD GEL FLD LI USE USELI SLD as default System voltage 12V 24V Battery operating voltage range 8V 32V Rated charging current 10A 20A Maximum solar panel power 130W 12V 260W 24V 260W 12V 520W 24V Maximum PV open circuit voltage 60V 55V protection 50V recovery MPPT operating voltage range Battery voltage 2V 45V MPPT tracking efficiency 99 Charging conversion...

Page 5: ... full charging When the battery voltage is as low as the reconnect voltage of boost charging the system will exit the floating charging stage and re enter the next charging cycle 07 08 Fig 4 1 Charging curve of lead acid battery Charging voltage Time Equalizing charging voltage MPPT Boost charging voltage Floating charging voltage Charging reconnect voltage Constant voltage Floating Charging curren...

Page 6: ...age 14 4V 14 2V 14 6V 14 4V 9 17V 9 17V Float charge voltage 13 8V 13 8V 13 8V 9 17V Boost charging reconnect voltage 13 2V 13 2V 13 2V 13 2V 9 17V 9 17V Over discharge restoring voltage 12 6V 12 6V 12 6V 12 6V 9 17V 9 17V Under voltage alarming voltage 12 0V 12 0V 12 0V 12 0V 9 17V 9 17V Over discharge voltage 11 1V 11 1V 11 1V 11 1V 9 17V 9 17V Over discharge cutoff voltage 10 6V 10 6V 10 6V 10 ...

Page 7: ...0 115200kps 9600kps Device address 1 247 1 System restart F01 Function key Factory data reset F02 Function key Clear historical data F03 Function key Note 24V battery system automatically multiply by 2 according to the set value to get the actual control value Boost charging voltage Float charge voltage Light control voltage 8 3 Type of battery Please refer to 8 1 and 8 2 for setting 8 4 Equalizin...

Page 8: ... light control When the solar panel voltage is less than the Light control ON voltage with a duration is more than the light control delay turn on the load When the solar panel voltage is greater than the light control OFF voltage with a duration is greater than the light control delay turn off the load 1 14 Light control time control 1 14 h After the duration during which the solar panel voltage i...

Page 9: ...ion line sequence definition 10 RS485 CAN communication Optional 8 15 RS485 communication baud rate 8 16 Equipment address The device communication address can be modified according to actual needs The RS485 communication baud rate can be modified according to actual needs 8 17 System restart Single press ENTER F01 flashes single press ENTER again the controller will reboot Definition S N Positive term...

Page 10: ...ery may produce combustible gas Stay away from sparks When installing outdoors avoid direct sunlight and rain seeping The falsely connected connection points and corroded wires may cause great heat melt the wire insulation burn the surrounding materials and even cause fire Therefore it is necessary to ensure that all connectors are tightened and the wires are preferably fixed with ties to avoid shak...

Page 11: ...r or replace timely if any Check whether there is any exposed or broken wire or wire with poor insulation and repair or replace timely if any Check whether there is dirt nesting insects or corrosion and clean timely if any Warning There is a risk of electrical shock Before carrying out checks or operations above make sure that all power supplies for the controller are disconnected Any non professi...

Page 12: ... spacing 137 77mm Fixed hole position φ4 5mm 18 System wiring diagram 18 1 System wiring diagram 22 17 Product Dimensions 17 1 Shiner2410 17 2 Shiner2420 Model Shiner2420 Product dimension 181 118 61 7mm Mounting hole spacing 161 96mm Fixed hole position φ4 5mm fuses ...

Reviews: