DCA-300SSK III — PARTS AND OPERATION MANUAL (FEMA) — REV. #1 (05/07/03) — PAGE 29
DCA-300SSK III — GENERATOR OUTPUTS/GAUGE READING
How to Read the Output Terminal Gauge.
The AC ammeter and AC voltmeter change-over switches
on the control panel
DO NOT
effect the generator output.
They are provided to help observe how much power is being
supplied, produced at the UVWO terminals lugs.
When the voltage change-over board is jumpered for
3Ø,
240V operation (See Figure 16), place the
AC Voltmeter
Change-Over
Switch
(Figure 17) to the W-U position and
the
AC Ammeter Change-Over Switch
(Figure 19) to the U
or W position to read the output on the selected leg.
The
ammeter
and
voltmeter
gauges are only active when the
UVWO terminals are in use.
NOTE
Figure 16. Voltage Change-Over Board
240V Configuration
Maximum Amps
Table 9 shows the
maximum
amps the generator can pro-
vide.
DO NOT
exceed the maximum amps as listed.
Figure 18 AC Voltmeter
Gauge
(Volt reading on W-U Lug)
Figure 17. AC Voltmeter
Change-Over Switch
A
0
40
60
75
20
Figure 20. AC Ammeter
(Amp reading on U lug)
Figure 19. AC Ammeter
Change-Over Switch
s
p
m
A
m
u
m
i
x
a
M
r
o
t
a
r
e
n
e
G
.
9
e
l
b
a
T
l
e
d
o
M
II
I
K
S
S
0
0
3
A
C
D
e
g
a
t
l
o
V
d
e
t
a
R
s
p
m
A
m
u
m
i
x
a
M
e
s
a
h
P
e
l
g
n
i
S
tl
o
V
0
2
1
)
e
ri
w
4
(
s
p
m
a
0
0
0
2
e
s
a
h
P
e
l
g
n
i
S
tl
o
V
0
4
2
)
e
ri
w
4
(
s
p
m
a
0
0
0
1
e
s
a
h
P
e
e
r
h
T
tl
o
V
0
4
2
s
p
m
a
0
2
7
e
s
a
h
P
e
e
r
h
T
tl
o
V
0
8
4
s
p
m
a
0
6
3
Summary of Contents for DCA-300SSK III Series
Page 2: ...PAGE 2 DCA 300SSK III PARTS AND OPERATION MANUAL FEMA REV 1 05 07 03 ...
Page 7: ...DCA 300SSK III PARTS AND OPERATION MANUAL FEMA REV 1 05 07 03 PAGE 7 NOTE PAGE ...
Page 41: ...DCA 300SSK III PARTS AND OPERATION MANUAL FEMA REV 1 05 07 03 PAGE 41 NOTE PAGE ...
Page 53: ...DCA 300SSK III PARTS AND OPERATION MANUAL FEMA REV 1 05 07 03 PAGE 53 NOTE PAGE ...
Page 103: ...DCA 300SSK III PARTS AND OPERATION MANUAL FEMA REV 1 05 07 03 PAGE 103 NOTE PAGE ...