Recirculating cooler
(
Chiller
)
7
1-2 times enlarge the distance if large size unit installed.
Unit installation:
Unpack the unit and check the packing list, if there is a shortage contact your
local distributor for solutions .
Move the unit from the packing base to spacious position and check for damages
incurred during transit. Install the unit in the proper position and ensure it is stable
and safe, then install the external circulating loop pipelines.
Please ensure correct collection of the external circulating water loop (That is,
the water outlet of the chiller should be connected to the water inlet pipe of the
instrument needs to be cooled; the return pipe of the instrument should be
connected to the water inlet ).
Please pay attention to joint leakage after injection of the bath liquid. If
leakage happens, please fix it in time.