Manual ERS (Energy Recovery System)
MSF-Vathauer Polska Sp. z.o.o ul. Staszica 37 PL-64-600 Oborniki
Tel: 0048 503972873 E-mail
info@msf-technik.pl
www.msf-technik.pl
Page 4 of 23
1. Safety and application notes for the ERS
1.1. General
During operation the ERS can get under certain circumstances live parts and hot surfaces.
Any unauthorized removal of the required cover, inappropriate use, incorrect installation or operation
may result in death, severe injury or material damage.
All works for transportation, installation and initialization and maintenance work must be carried out by
qualified personnel (IEC 364 and CENELEC HD 384 or DIN VDE 0100 and IEC report 664 or DIN
VDE 0110 and national accident prevention regulations or VGB 4).
Qualified personnel in the context of these basic safety notes are persons familiar with installation,
assembly, commissioning and operation of the product and who possess the appropriate qualifications
(defined in IEC 364 or DIN VDE 0105).
1.2. Intended Use
The ERS is a component, which is intended for installation only in machines in commercial
installations in conjunction with a frequency inverter or a servo controller.
The commissioning of the ERS-frequency inverter or ERS-Servo controller constellation is prohibited
until it is determined that the machine in which the device is installed, complies with the provisions of
EU Directive 2006/42 / EC (Machinery Directive).
The ERS meets the protection objectives of the Low Voltage Directive 2006/95 / EC and the
harmonized standards of the EN 50178 / DIN VDE 0160 in conjunction with EN 60439-1 / DIN VDE
0660 part 500 and EN 601 146 / DIN VDE 0558.
Operation is only permitted in compliance with the EMC - law ( 2014/30/EU).
The technical data and information on the connection conditions can be obtained from the nameplate
or the documentation and must be observed.
1.3. Transportation and storage
The instructions for transportation, storage and proper handling must be observed
After delivery damages found must be reported to the transport company immediately.
Before commissioning the supplier can optionally be contacted.
Climatic conditions must be observed according to EN 50178th