        WARNING: 

1. Read and follow instructions carefully. Proper training and periodic review 

regarding the use of this equipment is essential to prevent possible serious injury 

and/or property damage. The instructions contained herein were developed for 

using this equipment on fittings manufactured by Mueller Co. only, and may not be 

applicable for any other use.

2. DO NOT exceed the pressure ratings of any components or equipment. Exceeding 

the rated pressure may result in serious injury and/or property damage.

3. Safety goggles and other appropriate protective gear should be used. Failure to do 

so could result in serious injury.

HG-8 

Cold Climate 

Flushing System

Installation Instructions  

2 - 3

Programming Unit  

3 - 6

Assembly, Disassembly, & 
Maintenance Instructions 

7

Troubleshooting  

8

Upgrades & Battery Replacement 

9

Parts 10

Notes 11

F 13091 9/19

!

Summary of Contents for Hydro-Guard HG-8 Cold Climate

Page 1: ...by Mueller Co only and may not be applicable for any other use 2 DO NOT exceed the pressure ratings of any components or equipment Exceeding the rated pressure may result in serious injury and or pro...

Page 2: ...e storm pond etc The meter and flushing assembly can be raised for maintenance and repair and then lowered back down into the box below the frost line A medium density foam insulation pad freeze prote...

Page 3: ...w existing grade and ensure the meter lid is level with existing grade 7 Place the pit in the excavated area and connect the inlet piping Hand tighten the fitting to the pit then turn two full turns w...

Page 4: ...te the device list can be found on the label located on the back of the controller housing with the designation Default name The App will indicate that it is in the process of connecting 8 Once the de...

Page 5: ...controller 3 Make sure no water is inside battery compartment 4 Screw the NODE rear body back onto front half NOTE Make sure that seal marker on rear half of the NODE lines up with front half ensuring...

Page 6: ...time in 15 minute increments 4 Press RIGHT ARROW key to add an additional START TIME to program displayed The start time number is shown in upper left corner of display 5 Press PRG key to add START T...

Page 7: ...intenance If disassembly is necessary please follow the directions below Always close the curb stop before working on the unit Disassembly 1 Shut off water supply to the unit and remove the green hous...

Page 8: ...or lack of connection Run a manual flush and confirm the solenoid plunger is kicking out and pulling back in by listening for a click Check connections for corrosion breaks or lack of connection Chec...

Page 9: ...d until snug The following is a brief overview and introduction to our options Integrated Sample Station The HG 8 Cold Climate Sub Surface Discharge Unit features a Sample Port quick connect that allo...

Page 10: ...ine Dechlorination Assembly 10 HG FP100 Thermal Control Valve 11 546138 100 1 Backflow Double Check Valve 12 014215 330N 1 Meter Coupling 13 024265 1 330N 1 Ball Angle Meter Valve 14 014210 1 330N 1 M...

Page 11: ...11 Notes HG 8 COLD CLIMATE FLUSHING SYSTEM...

Page 12: ...are liable only for their own acts and omissions and not those of each other MWP brands include Mueller Echologics Hydro Gate Hydro Guard HYMAX Jones Krausz Mi Net Milliken Pratt Pratt Industrial Sing...

Reviews: