APPENDIX A
COMMISSIONING SUMMARY
A-7
S11 SETPOINTS
MONITORING
TRIP COUNTER
Trip Counter Alarm
Assign Alarm Relays
Trip Counter Alarm
Alarm Events
STARTER FAILURE
Starter Failure Alarm
Starter Type
Assign Alarm Relays
Starter Failure Delay
Supervision Of Trip Coil
Alarm Events
CURRENT DEMAND
Current Demand Period
Current Demand Alarm
Assign Alarm Relays
Current Demand Limit
Alarm Events
kW DEMAND
kW Demand Period
kW Demand Alarm
Assign Alarm Relays
kW Demand Limit
Alarm Events
kvar DEMAND
kvar Demand Period
kvar Demand Alarm
Assign Alarm Relays
kvar Demand Limit
kvar Demand Alarm
Events
kVA DEMAND
kVA Demand Period
kVA Demand Alarm
Assign Alarm Relays
kVA Demand Limit
Alarm Events
PULSE OUTPUT
+ kWh Pulse Out. Relay
+ kWh Pulse Out. Int.
+ kvarh Pulse Out. Relay
+ kvarh Pulse Out. Int.
– kvarh Pulse Out. Relay
– kvarh Pulse Out Int.
Running Time Pulse Relay
Running Time Pulse Int.
Summary of Contents for SR469
Page 7: ......
Page 19: ...2 INSTALLATION MECHANICAL 2 5 2 1 5 TERMINAL LOCATIONS Figure 2 11 TERMINAL LAYOUT...
Page 21: ...2 INSTALLATION ELECTRICAL 2 7 Figure 2 12 TYPICAL WIRING DIAGRAM...
Page 32: ...ELECTRICAL 2 INSTALLATION 2 18 2 2 14 TYPICAL 2 SPEED MOTOR WIRING...
Page 39: ...OVERVIEW 3 SR469 OPERATION 3 6 yy SETPOINTS yy S1 SR469 SETUP...
Page 104: ...4 SETPOINT PROGRAMMING S11 MONITORING 4 65 Figure 4 24 TRIP COIL SUPERVISION...
Page 113: ...S12 ANALOG I O 4 SETPOINT PROGRAMMING 4 74...
Page 244: ...8 469PC PROGRAM WAVEFORM CAPTURE 8 13 Figure 8 11 WAVEFORM CAPTURE...