Do
cu
men
t N
o.
O
pti
ma
16
Ins
tal
la
tio
n G
ui
de
Contact Us |
North America
Tel: +1 440 366 6966
Fax: +1 440 366 6802
Email:
Tel: +1 440 366 6966
Fax: +1 440 366 6802
Email:
Tel: +1 505 885 02379
Mobile: +1 505 885 02379
Email:
bcastro@gomultilink.com
Europe, Middle East & Africa
Latin & South America
Page 2
Visit
for new product releases!
INST
ALL
ATION
Cop
yr
igh
t ©
201
9 M
ul
til
in
k I
nc
. A
ll r
igh
ts
re
se
rv
ed • Sp
eci
fic
at
ion
s s
ub
jec
t t
o ch
an
ge wi
tho
ut
no
tic
e •
Re
v.
11
/2
0/
201
9 •
D
oc
ume
nt
N
o.
O
pti
m
a 1
6 I
nst
all
at
ion
G
uid
e
Table of Contents (Cont.)
4.10 Install CSM Clamp
4.11 Fiber Management Clips
4.12 Proper Grommet Seal
4.13 Install CSM & Cable Grommet
4.14 Secure Cable to Base
4.15 Fiber Routing & Attach Tie-Wraps
4.16 Buffer Tube Branching
4.17 Attach Tie-Wraps
Splicing Buffer Tube to Pigtail
4.18 Splice Input Fiber to Pigtail
4.19 Splice Tray Routing
4.20 Attach Splice Tray
4.21 Attach Splice Tray Cover
4.22 Pigtail & Branch Buffer Tube Routing
Optima 16 Hinged Shell Installation
4.23 Fiber Management & Tie-Wraps
4.24 Pigtail Fiber Routing
4.25 Fiber Management
4.26 Bulkhead Adapter(s) & Connector(s)
4.27 Sealing the Gap
4.28 Closing the Fiber Closure
4.29 Apply Sealant to the Perimeter
4.30 Start to Connect Cover to Base
4.31 Tighten Bolts to S-Base