Visit
for new product releases!
INST
ALL
ATION
Cop
yrigh
t © 2019 Multilink I
nc
. A
ll righ
ts r
eser
ved • Sp
ecific
ations subjec
t t
o change without notic
e • Re
v. 11/20/2019 •
Page 13
Do
cu
men
t N
o.
O
pti
ma
16
Ins
tal
la
tio
n G
ui
de
4.28 Closing the Fiber Closure
Once everything has been completed on
the splice side of the Optima 16 then you are ready
close the closure firmly. Ensure the fiber pigtail is
held in place so that the buffer tubes do not get
pinched in closing.
4.29 Apply Sealant to the Perimeter
Before completely shutting the closure
flush, apply the supplied sealant to the gasket
perimeter of the Optima 16 base. This will ensure
a proper seal preventing various elements from
entering.
4.30 Fasten Latches to Connect Cover to Base
Once the sealant has been applied then
close the Optima 16 using the 5 latches on the top,
bottom and right sides of the closure. Be sure to
seal each latch properly to ensure the Optima 16
remains closed.
Installation (Cont.)