background image

Page 6

© Multilink Inc. 2021  

  All Rights Reserved  

www.gomultilink.com

Do

cumen

t N

o. 965-088-10I

nstall

INST

ALL

ATION

Cop

yrigh

t © 2021 Multilink I

nc

. A

ll righ

ts r

eser

ved  •  Sp

ecific

ations subjec

t t

o change without notic

e  •  Re

v. 11/16/2021

Do

cumen

t N

o. 965-088-10I

nstall

4. Installation

Entry Cable Preparations

4.2 Cable Jacket Removal

Find the rip cord in the cable and pull to 

help separate the jacket from the cable. Remove 

the outer jacket and trim away all the protective 

layers leaving the Central Strength Member (CSM) 

and buffer tubes exposed across the length of the 

ring cut.

BUFFER TUBES

CSM

4.1 Entry Cable Prep

Note: Designed for max 

72 count, optimal 48 count. 

Determine point for first cut, then mark 

and measure 64" for 72 count OR 84" for 48 count and mark for second cut. Using the appropriate 

tool, make a ring cut at both locations. Carefully make a horizontal cut from one circle cut to the 

other. During the cutting process, be sure not to damage the buffer tubes inside the cable.

BUFFER TUBES

CABLE SHEATH

(OSP CABLE)

RING-CUT LINE FOR SHEATHING

CABLE SHEATH

(OSP CABLE)

RING-CUT LINE FOR SHEATHING

ultilink

BURRS ALLOWED

SCALE:

SIZE

CAD   FILE:

DWG.  NO.

A

SHEET

OF

REV.

DRAWN BY:

FRACTIONS    DECIMALS    ANGLES

1/32

MATERIAL:

FINISH:

DO  NOT  SCALE  DRAWING

RING CUT VIEW

RING CUT VIEW

1:2.5

1

1

DESCRIPTION OF CHANGE

REV

DATE

ECN#

.XX= .03

.XXX= .010

1

ALL FLATS TO BE  .005

BY

MFG

ENG

UNLESS OTHERWISE SPECIFIED

DIMENSIONS ARE IN INCHES

TOLERANCES ARE:

DATE:

THIS DOCUMENT AND THE INFORMATION

CONTAINED THEREIN ARE CONFIDENTIAL 

& PROPRIETARY TO MULTILINK AND MAY NOT

BE COPIED OR DISCLOSED TO OTHERS 

WITHOUT A WRITTEN CONSENT FROM 

MULTILINK. THE INFORMATION IS TO BE 

PROMPTLY RETURNED TO MULTILINK UPON 

REQUEST.

DATE:

DATE:

DATE:

CHECKED:

MFG ENG:

QUALITY

ENG:

m

04/27/15

RING CUT VIEW

CN

01

SEE B.O.M.

N/A

CN

04/27/15

01 N/A INITIAL RELEASE

64" FOR 72 COUNT

or 84" FOR 48 COUNT

(SHEATH OPENING)

Figure 4.1

4.3 Cut & Trim CSM

Measure 2" inches from each side of the ring cut locations with the exposed buffer tubes 

and make a mark on each side of the CSM. Cut and trim the CSM discarding the 60"-80" inch section 

(

Figure 4.3

). If using armored cable continue to 4.4, else continue to 4.10.

2.00 

2.00 

(AFTER STRENGTH MEMBER TRIMMING)

CENTRAL STRENGTH MEMBER

.00"

(TRIM THIS SECTION 

AND DISCARD)

2.00 

2.00 

BUFFER TUBES

(REMOVED FOR CLARITY)

CABLE SHEATH

(OSP CABLE)

CABLE SHEATH

(OSP CABLE)

CENTRAL STRENGTH MEMBER

ultilink

BURRS ALLOWED

SCALE:

SIZE

CAD   FILE:

DWG.  NO.

A

SHEET

OF

REV.

DRAWN BY:

FRACTIONS    DECIMALS    ANGLES

1/32

MATERIAL:

FINISH:

DO  NOT  SCALE  DRAWING

CENTRAL STRENGTH VIEW

CENTRAL STRENGTH VIEW

1:2.5

1

1

DESCRIPTION OF CHANGE

REV

DATE

ECN#

.XX= .03

.XXX= .010

1

ALL FLATS TO BE  .005

BY

MFG

ENG

UNLESS OTHERWISE SPECIFIED

DIMENSIONS ARE IN INCHES

TOLERANCES ARE:

DATE:

THIS DOCUMENT AND THE INFORMATION

CONTAINED THEREIN ARE CONFIDENTIAL 

& PROPRIETARY TO MULTILINK AND MAY NOT

BE COPIED OR DISCLOSED TO OTHERS 

WITHOUT A WRITTEN CONSENT FROM 

MULTILINK. THE INFORMATION IS TO BE 

PROMPTLY RETURNED TO MULTILINK UPON 

REQUEST.

DATE:

DATE:

DATE:

CHECKED:

MFG ENG:

QUALITY

ENG:

m

04/27/15

CENTRAL STRENGTH VIEW

CN

01

SEE B.O.M.

N/A

CN

04/27/15

01 N/A INITIAL RELEASE

64" FOR 72 COUNT

or 84" FOR 48 COUNT

(SHEATH OPENING)

Figure 4.3

Note: 

Fiber optic cable is sensitive to excessive pulling, bending, and crushing forces. Consult the cable specification 

sheet for the cable you are installing. 

Do not bend the cable more sharply than the minimum recommended bend 

radius. Do not apply more pulling force to the cable than specified. Do not crush the cable or allow it to kink.

 Doing 

so may cause damage that can alter the transmission characteristics of the cable; the cable may have to be replaced. Follow 

your company’s standard installation process for fiber preparation. If none, then measure.

Summary of Contents for Optima U

Page 1: ...ilink com Optima U Enclosure General 3 1 Introduction 3 1 1 Product Description 1 2 Optima U Dimensional Drawing 2 Preparations 4 2 1 Installation Outline 2 2 Optima U Checklist 2 3 Recommended Tools...

Page 2: ...4 14 Secure Cable to Base 4 15 Add the Bridge to Lock Assembly 4 16 Fiber Routing Attach Tie Wraps 4 17 Buffer Tube Branching 4 18 Attach Tie Wraps Splicing Buffer Tube to Pigtail 11 4 19 Splice Inpu...

Page 3: ...cable This guide is for installers who are familiar with fiber optic cable systems and their applications 1 1 Product Description Multilink s Optima U enclosure allows a FTTX provider to access the f...

Page 4: ...Removal of cable jacketing and excess CSM Central Strength Member Ring cut fiber separation CSM tie down and routing fiber Securing fiber in place to the Optima U closure Configuring grommets for cab...

Page 5: ...broken cut pieces of fiber and place on a piece of tape that has been set aside for this purpose 3 4 Sharp Edge Warning The wearing of cut resistant safety gloves to protect your hands from sharp cutt...

Page 6: ...T VIEW CN 01 SEE B O M N A CN 04 27 15 01 N A INITIAL RELEASE 64 FOR 72 COUNT or 84 FOR 48 COUNT SHEATH OPENING Figure 4 1 4 3 Cut Trim CSM Measure 2 inches from each side of the ring cut locations wi...

Page 7: ...en the buffer tubes and armor Repeat on opposite side of ring cut 4 4 Armored Cable Once desired length is cut 4 3 remove at least 1 of the cable s outer jacket to expose the armor shielding CABLE ARM...

Page 8: ...Insert the supplied ground lug with the terminal lug on the outside of the Optima U compressing the rubber seated gasket to the outside of the enclosure to ensure a water tight seal With the long thr...

Page 9: ...cut grommet cut side and secure the grommet around the cable Then coat the outside of the feeder port grommet prior to seating in base assembly 4 13 Secure Cable to Base After your fiber is bound via...

Page 10: ...rs 4 18 Attach Tie Wraps Using the supplied tie wraps insert into each fiber management clip on the upper side of the base to hold the branched off buffer tubes Installation Cont 4 16 Install CSM Cabl...

Page 11: ...y Routing Place the completed splice tray within the Optima U base Route the branched off buffer tube s accordingly with how the pigtail slack will be routed 4 19 Splice Input Fiber to Pigtail Followi...

Page 12: ...the grommets are inserted into the bridge in the correct orientation matching up the grooves Secure each drop to the strain relief bracket using the supplied zip ties to prevent the fiber from moving...

Page 13: ...Install Optidrop Fiber Connector Remove the cover from the adapter Then remove the dust cap from the connector and insert the connector into the adapter following the standard fiber color chart An aud...

Page 14: ...ations subject to change without notice Rev 11 16 2021 Document No 965 088 10Install 4 31 Final Bolt Finally secure with bolt on the drop end of enclosure Please note a recommended torque spec of 25 3...

Page 15: ...ma U and patch splice options including installable kits and pigtails Feeder Port Grommets Products Description Stock ID Flat Drop 642 114 10 43 Round 642 113 13 48 Round 642 113 10 58 Round 642 113 1...

Page 16: ...all Surelight Field Installable Kits Products Description Stock ID Tool Kit w Beaver Cleaver 072 656 20 Tool Kit w Precision Cleaver 072 656 21 Accessory List Cont Splice Tray Products Description Sto...

Page 17: ...Tel 1 440 366 6966 Fax 1 440 366 6802 Email engsupport gomultilink com Tel 1 440 366 6966 Mobile 1 440 366 6802 Email lasupport gomultilink com Europe Middle East Africa Latin South America Multilink...

Reviews: