PAGE 26 — GAC6HR/HRS 60 HZ GENERATOR• OPERATION AND PARTS MANUAL — REV. #1 (12/13/17)
OPERATION
Figure 23. 120V Twist-Lock/GFCI Receptacles
13. Place the full power switch (Figure 24) in the 240/120V
position (down).
Figure 24. Full Power Switch
240/120V Position (Down)
14. Read voltmeter on front panel of generator (Figure 25)
and verify that 240 VAC is displayed. Using an external
voltmeter as shown in Figure 25, verify that 240 VAC is
present at the 120/240V, L14-30R twist-lock receptacle.
120V
OFF
V~
V
300 mV
A
A~
V
COM
120 VAC
GFCI
L5-30R
120
V
G
W
120VAC
X
DOWN
240/120V
Figure 25. 120/240V L14-30R Receptacle
15. Connecting of loads (power tools, lighting etc.) to the
generator receptacles can now be done.
240
V
OFF
V~
V
300 mV
A
A~
V
COM
240 VAC
L14-30R
240VAC
G
Y
X
W
120VAC
G
Y
X
W
120VAC
120VAC
L14-30R
NOTICE
When using a combination of dual receptacles, total
load should not exceed the rated capacity of the
generator.