MultiScree
∂
Channel
2)
Double click on the start date to bring up a calendar. The current date
is circled in red, and the currently selected date is highlighted in grey.
3)
The month and year are shown at the top of the calendar. You can
click the small grey buttons to the left and right of the month and year
to cycle forward or backward one month.
4)
To select a specific month, click the current month and select the
month you want from the drop down list.
5)
To select a specific year, click the current year. Two buttons will
appear to the left of the date. Click the top button to increase the year
by one, and the bottom button to decrease the year by one.
6)
Finally, select the date from the list available by clicking on it.
7)
Repeat these steps for the finishing date.
8)
The sequence will only display between these dates. Ensure that the
end date is actually later than the start date.
[f]
[g]
[h]
Click
Add Entry
to add the sequence to the schedule.
Move the sequence entry up or down the list using the on-screen arrow
buttons until it is at the correct priority position. Number 1 (at the top of the
list) is the entry with the highest priority.
You can add another sequence to the schedule by repeating the above steps.
Otherwise, click
Save
to save the changes you have made and return to the
Sequence Editor.
78