background image

LEGAL202107V01 

                                                                                      

 

 

17 

strongly recommends using the genuine connector type specified by München Solar's product data sheet. 
Any choice of a different connector type other than specified may void the warranty of the module. 

To ensure reliable electric connection and to prevent possible intrusion of humidity, two connectors must 
be mated and locked together until a click can be heard. 

Long-term exposure to wet environments may cause connectors' poor connectivity, resulting in current 
leakage and poor conductivity which voids the warranty. München Solar recommends proper 
connector/cable/wire management to prevent moisture intrusion. Depending on the amount of humidity, 
München Solar recommends periodic inspections of the installation system to maintain optimal module 
performance. 

The DC current generated by photovoltaic systems can be converted into AC and fed into a public Grid. 
As local utilities’ policies on connecting renewable energy systems to the Grids vary from region to region. 
Always seek the advice from a qualified system designer or integrator. Building permits, inspections and 
approvals by the local utility are generally required. 

Especially for larger installations München Solar recommends lightning protection following the local 
requirements and regulations. 

When the installation is finished and after connection to the grid please do a professional hand over to the 
owner including an installation protocol is required. Provide a clear documentation of the system to the 
owner consisting of following minimum data such as: user guide, system layout, data sheets, 
performance expectations, electrical system data e.g. a copy of the installation test report following 
minimum requirements of IEC 62446 / IEC 60364-6.

 

 

4.3. 

Grounding 

 

For grounding and bonding requirements, please refer to regional and national safety and electricity 
standards. If grounding is required, use a recommended connector type for the grounding wire. 

For grounding, this guide refers to module frame grounding. If grounding is required, make sure module 
frames (metal exposed to touch) are always grounded. 

München Solar recommends always refer to local state and national code requirements for PV module 
grounding. München Solar highly recommends negative grounding if it's allowed by local authorities. 

When attaching the frame grounding hardware and wire to the frame it must be placed corresponding to 
the ground symbol stamped location to ensure proper electrical connection. 

München Solar recommends one of the following parts for grounding: 

 

1)  Use M5 bolt and washer to bond the ground wire and aluminum frame through the grounding hole (as 

shown below). The tightening torque is 3-7Nm. All nuts and washers should be made of stainless steel. 
4-14 mm2 (AWG 6-12) exposed copper wire is recommended as ground wire.

 

Summary of Contents for MSMD M10-60 Series

Page 1: ...M nchen Solar Installation Manual M nchen Energieprodukte GmbH www muenchen energieprodukte de...

Page 2: ...y 3 1 4 Fire Safety 4 2 Product Identification 5 3 Mechanical installation 6 3 1 Selecting the location 6 3 2 General Installation 6 3 3 Installation methods 7 3 4 Attachment guidelines 8 4 Electrical...

Page 3: ...t light energy to direct current electrical energy They are designed for outdoor use Modules can be ground mounted mounted on rooftops The proper design of support structures lies within the responsib...

Page 4: ...eriod of time always cover the modules and ensure that the glass faces down on a soft flat surface to prevent water from collecting inside the module and causing damage to exposed connectors 1 3 Insta...

Page 5: ...ctors to connect modules to form a string or connect to another device Removing the connectors will void the warranty 1 4 Fire Safety Consult your local authority for guidelines and requirements for b...

Page 6: ...o 1000 1500 volts while other UL products are 600 volts Check your nameplate or contact your local representative for details 2 Barcode each individual module has a unique serial number The serial num...

Page 7: ...ys use a tested and certified mounting structure approved for your system design In regions with heavy snowfall in winter select the height of the mounting system so that the lowest edge of the module...

Page 8: ...maximum permissible loads and are not subject to excessive forces due to the thermal expansion of thesupport structures Never allow modules overlap or exceeds the rooftop Refertothefollowinginstallati...

Page 9: ...t of 1600 Pa 0 232psi 2500 Pa 0 363 psi and 3600 Pa 0 522 psi respectively under UL 1703 standard The diagrams in the tables below are designed for illustration purpose For each installation modules c...

Page 10: ...0 Pa safety factor 1 5 M2 30 series M3 30 series M3 60 series M6 60 series Test load positive 5400 Pa negative 2400 Pa Design load positive 3600 Pa negative 1600 Pa safety factor 1 5 M2 30 series M3 3...

Page 11: ...Pa negative 3800 Pa Design load positive 3600 Pa negative 2533Pa safety factor 1 5 M2 30 series M3 30 series M3 60 series M6 60 series M6 72 series M10 60 series M10 72 series Clamp zone A 1 4 long f...

Page 12: ...sitive 5400 Pa negative 3800 Pa Design load positive 3600 Pa negative 2533Pa safety factor 1 5 M6 60 series M6 72 series M10 60 series M10 72 series Clamp zone A0 1 4 short frame length 50 mm A1 100 m...

Page 13: ...gative 3800 Pa Design load positive 3600 Pa negative 2533Pa safety factor 1 5 M2 30 series M3 30 series M3 60 series M6 60 series M6 72 series M10 60 series M10 72 series Attentions The module clamps...

Page 14: ...7V01 13 The mounting holes reserved for tracker mounting system with special accessories The length of module is over 2 meters whose load value with tracker needsto be confirmed by module supplier res...

Page 15: ...connected to the PV output Voltages are additive when modules are connected in series and modules currents are additive when Modules are connected in parallel as illustrated in Figure 1 Modules with...

Page 16: ...e maximum number of modules that can be connected in series within a string for the specific project must be calculated based on the actual local temperature If there is reverse current exceeding the...

Page 17: ...maximum series fuse rating of module and local electrical installation code always make sure M nchen Solar PV modules are assembled with the appropriate string fuse for circuit protection There is no...

Page 18: ...allation is finished and after connection to the grid please do a professional hand over to the owner including an installation protocol is required Provide a clear documentation of the system to the...

Page 19: ...F to bond solar modules to module mounting brackets grounding part is tested to UL467 3 Use WEEB DPF to bond solar modules to module mounting brackets grounding part is tested to UL467 Recommend faste...

Page 20: ...tions every six months to verify that they are clean secure undamaged and free of corrosion Or else the warranty may be voided In the event of a ground fault condition NEVER wash or spray modules with...

Reviews: