© Munters AB, 2014
9
Figure 7: FSW 2 Wiring Diagram *(up to Eight Load Cells) with an External Power Source
Key:
1: Place two jumpers on EXT.
2: For more than six load cells, connect an external power supply and move the
jumper to the EXT position.